Ads
related to: architectural finish schedule sample
Search results
Results From The WOW.Com Content Network
A sample is a physical portion of the specified product. Some samples are full product samples, such as a brick or section of precast concrete, or a partial sample that indicates color or texture. [2] The product sample is often required when several products are acceptable, to confirm the quality and aesthetic level of the material.
Historic paint analysis, or architectural paint research, is the scientific analysis of a broad range of architectural finishes, and is primarily used to determine the color and behavior of surface finishes at any given point in time. This helps us to understand the building's structural history and how its appearance has changed over time.
A rolling punch list entails constantly verifying the work status throughout the duration of the project, with a rigid closeout schedule being assigned to each task. Finishing the project error-free requires planning, communication, and managing the punch list throughout the project. [5]
The Construction Specifications Institute (CSI) is a United States national association of more than 6,000 construction industry professionals who are experts in building construction and the materials used therein.
Exterior insulation and finish system (EIFS) is a general class of non-load bearing building cladding systems that provides exterior walls with an insulated, water-resistant, finished surface in an integrated composite material system. EIFS has been in use since the 1960s in North America and was first used on masonry buildings.
A #4 architectural finish is characterized by fine polishing grit lines that are uniform and directional in appearance. It is produced by polishing the metal with a 120–180 grit belt or wheel finish and then softened with an 80–120 grit greaseless compound or a medium non woven abrasive belt or pad. #4 Dairy or sanitary finish
Ad
related to: architectural finish schedule sample