When.com Web Search

  1. Ads

    related to: best angle for joist hangers for drywall trim boards

Search results

  1. Results From The WOW.Com Content Network
  2. Toenailing - Wikipedia

    en.wikipedia.org/wiki/Toenailing

    Toenailing or skew-nailing is a viable, structurally sound method [1] of the driving of a nail at a roughly 30° [2] angle to fasten two pieces of wood together, typically with their grains perpendicular. The term comes colloquially from fastening wood at the bottom, or toe, of the board.

  3. Trimmer (construction) - Wikipedia

    en.wikipedia.org/wiki/Trimmer_(construction)

    In light-frame construction, a trimmer is a timber or metal beam (joist) used to create an opening around a stairwell, skylight, chimney, and the like. Trimmers are installed parallel to the primary floor or ceiling joists and support headers, which run perpendicular to the primary joists.

  4. Scarf joint - Wikipedia

    en.wikipedia.org/wiki/Scarf_joint

    The joint is formed by cutting opposing tapered ends on each member which are then fitted together. When working with wood, this gives better long grain to long grain gluing surface, which yields a stronger joint than would be achieved with a simple butt joint. The tapers are generally cut at an angle between 1:8 to 1:10.

  5. Furring - Wikipedia

    en.wikipedia.org/wiki/Furring

    Vertical, metal furring is applied to the wall to create a channel and receive the siding material. In construction, furring (furring strips) are strips of wood or other material applied to a structure to level or raise the surface, to prevent dampness, to make space for insulation, to level and resurface ceilings or walls, [1] or to increase the beam of a wooden ship.

  6. Butt joint - Wikipedia

    en.wikipedia.org/wiki/Butt_joint

    In solid timber, docking of members for a butt joint is usually a crosscut, so a crosscut saw is best for this job. When working with sheet goods, there is no distinction between crosscut and rip cut. The joint members can be docked by any of the following methods: Carcase butt joints. Crosscut saw; Circular saw and straightedge

  7. Joist - Wikipedia

    en.wikipedia.org/wiki/Joist

    A double floor is a floor framed with joists supported by larger timbers.. In traditional timber framing there may be a single set of joists which carry both a floor and ceiling called a single floor (single joist floor, single framed floor) or two sets of joists, one carrying the floor and another carrying the ceiling called a double floor (double framed floor).

  8. Tie (engineering) - Wikipedia

    en.wikipedia.org/wiki/Tie_(engineering)

    Although the use of steel joist hangers to support floor joists is recommended over a ledger supporting the joists because of house settling and nail separation, they are not required by code in most municipalities. However, toe nailing & end nailing is nowhere near as effective as using hangers to support flooring systems. [7]

  9. Drywall - Wikipedia

    en.wikipedia.org/wiki/Drywall

    Various sized cuts of 1 ⁄ 2 in (13 mm) drywall with tools for maintenance and installation . Drywall (also called plasterboard, dry lining, [1] wallboard, sheet rock, gib board, gypsum board, buster board, turtles board, slap board, custard board, gypsum panel and gyprock) is a panel made of calcium sulfate dihydrate (), with or without additives, typically extruded between thick sheets of ...