Ads
related to: thameslink train line map of italy and europe
Search results
Results From The WOW.Com Content Network
Thameslink [1] was a train operating company in the United Kingdom owned by Govia that operated the Thameslink franchise between March 1997 and March 2006. The franchise was originally due to end on 31 March 2004, however a two-year extension was awarded to Govia by the Strategic Rail Authority on 13 February 2004. [ 2 ]
The replacement route under Ludgate Hill was opened on 29 May 1990 by the Network SouthEast (sector of British Rail) concurrently with City Thameslink station, which was initially called St Paul's Thameslink but was renamed in 1991 to avoid confusion with St. Paul's station on the Underground (Central line), about 500 m (550 yd) away.
Thameslink is a 68-station main-line route running 225 km (140 miles) north to south through London from Bedford to Brighton, serving both London Gatwick Airport and London Luton Airport, with a suburban loop serving Sutton, Mitcham and Wimbledon and on weekdays a suburban line via Catford and Bromley South to Sevenoaks.
Map showing railway routes to be operated by Govia Thameslink Railway. The background map shows the coastline and major urban areas. Equirectangular map projection on WGS 84 datum, with N/S stretched 160%: Date: 25 August 2014: Source: Ordnance Survey OpenData. Great Britain coastline and boundary data from Boundary-Line product.
This is a route-map template for Thameslink, a UK railway.. For a key to symbols, see {{railway line legend}}.; For information on using this template, see Template:Routemap.
An ETR 500 train running on the Florence–Rome high-speed line near Arezzo, the first high-speed railway opened in Europe [3] Across the EU, passenger rail transport saw a 50% increase between 2021 and 2022, with the 2022 passenger-kilometers figure being slightly under that of 2019 (i.e. before the COVID-19 pandemic ). [ 4 ]