When.com Web Search

  1. Ads

    related to: removing a bearing from shaft hole tool set cost to fill wall

Search results

  1. Results From The WOW.Com Content Network
  2. Slurry wall - Wikipedia

    en.wikipedia.org/wiki/Slurry_wall

    The design of a slurry wall (diaphragm wall) includes the design of wall thickness and reinforcements. Thickness of a slurry wall in preliminary design is generally set to about 4-8% of the excavation depth. Slurry wall design is undertaken based on bending moment and shear envelope obtained from the stress analysis.

  3. Tunnel construction - Wikipedia

    en.wikipedia.org/wiki/Tunnel_construction

    Tunnel Construction. Tunnels are dug in types of materials varying from soft clay to hard rock. The method of tunnel construction depends on such factors as the ground conditions, the ground water conditions, the length and diameter of the tunnel drive, the depth of the tunnel, the logistics of supporting the tunnel excavation, the final use and shape of the tunnel and appropriate risk management.

  4. Underground hard-rock mining - Wikipedia

    en.wikipedia.org/wiki/Underground_hard-rock_mining

    Cut and fill mining is a method of short-hole mining used in steeply dipping or irregular ore zones, in particular where the hanging wall limits the use of long-hole methods. The ore is mined in horizontal or slightly inclined slices, and then filled with waste rock, sand or tailings. Either fill option may be cemented with binders to add ...

  5. Piling - Wikipedia

    en.wikipedia.org/wiki/Piling

    Also called caissons, drilled shafts, drilled piers, cast-in-drilled-hole piles (CIDH piles) or cast-in-situ piles, a borehole is drilled into the ground, then concrete (and often some sort of reinforcing) is placed into the borehole to form the pile. Rotary boring techniques allow larger diameter piles than any other piling method and permit ...

  6. Cut and fill - Wikipedia

    en.wikipedia.org/wiki/Cut_and_fill

    A mass haul diagram where land and rock cuts are hauled to fills Fill construction in 1909 Cut & Fill Software showing cut areas highlighted in red and fill areas shaded in blue. In earthmoving , cut and fill is the process of constructing a railway , road or canal whereby the amount of material from cuts roughly matches the amount of fill ...

  7. Completion (oil and gas wells) - Wikipedia

    en.wikipedia.org/wiki/Completion_(oil_and_gas_wells)

    This is the most common open hole completion used today. It is basically the same described on the vertical open hole completion but on a horizontal well it enlarges significantly the contact with the reservoir, increasing the production or injection rates of your well. Sand control on a horizontal well is completely different from a vertical well.

  8. Stoping - Wikipedia

    en.wikipedia.org/wiki/Stoping

    Square-set timbering was invented in the Comstock Lode, Virginia City, Nevada in the 1860s. Square-set stoping is a historical method of stoping which relies on interlocking timbers set into place forming a grid, wedged tightly against the rock. As the mining progresses, generally upwards, new timber sets are added to fill the void.

  9. Rolling-element bearing - Wikipedia

    en.wikipedia.org/wiki/Rolling-element_bearing

    A rolling element rotary bearing uses a shaft in a much larger hole, and spheres or cylinders called "rollers" tightly fill the space between the shaft and hole. As the shaft turns, each roller acts as the logs in the above example. However, since the bearing is round, the rollers never fall out from under the load.