Ads
related to: install post on concrete slab wall
Search results
Results From The WOW.Com Content Network
A hold-down may also refer to clamping device used to anchor a pipe to a structural steel element or concrete floor or allow movement of the pipe in an axial direction. [1] At the bottom, the hold down is connected to the concrete foundation or structural slab by an embedded or epoxied anchor bolt. At the top, the hold down is connected to a ...
Intermediate – A post in an exterior wall not at a corner. Chimney – An intermediate post receiving its name from being near a chimney. Interior – A general term for posts not in an exterior wall. Arcade – A post located between an aisle and nave. [10] Aisle – same as arcade post. [11] Corner – Any post at the corner of a building.
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel- reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving ( see below ).
Shoring is commonly used when installing the foundation of a building. A shoring system such as piles and lagging or shotcrete will support the surrounding loads until the underground levels of the building are constructed. Commonly used shoring equipment includes post shores, shoring beams, and timber jacks.
Poles, from which these buildings get their name, are natural shaped or round wooden timbers 4 to 12 inches (100 to 300 mm) in diameter. [4] The structural frame of a pole building is made of tree trunks, utility poles, engineered lumber or chemically pressure-treated squared timbers which may be buried in the ground or anchored to a concrete slab.
Sill plates — a lower wall plate which is bolted or strapped securely to the top of a foundation wall or concrete slab. These hold the house down against heavy winds. Normally, "J-bolts" are placed in the curing concrete after the mason levels the foundation and finishes dressing the concrete or anchor bolts are drilled into the concrete ...
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
In cavity walls, the windpost will typically be fixed into the inner and outer leafs of the wall by specialist fixings and fastenings at regular intervals along its length. The windposts will be spaced along the walls of the building at regular intervals as calculated by the engineer to suit the required loadings.