When.com Web Search

  1. Ad

    related to: how to run pipe under concrete slab location video

Search results

  1. Results From The WOW.Com Content Network
  2. Riser clamp - Wikipedia

    en.wikipedia.org/wiki/Riser_clamp

    Riser clamp for a standpipe through-penetration firestop inside a fire hose cabinet under construction A riser clamp is a type of hardware used by mechanical building trades for pipe support in vertical runs of piping (risers) at each floor level.

  3. Tremie - Wikipedia

    en.wikipedia.org/wiki/Tremie

    The tremie concrete placement method uses a vertical or nearly vertical pipe, through which concrete is placed by gravity feed below water level. [4]The lower end of the pipe is kept immersed in fresh concrete so that concrete rising from the bottom displaces the water above it, thus limiting washing out of the cement content of the fresh concrete at the exposed upper surface.

  4. Sleeve (construction) - Wikipedia

    en.wikipedia.org/wiki/Sleeve_(construction)

    For example, a 4" pipe, with 1" of thermal insulation makes a 6" penetrant (1" pipe covering on each side of the pipe), plus two pipe sizes = an 8" sleeve, creating a 1" annulus. In case of insulated piping, the size of the insulation must be taken into account for the intended firestop certification listing .

  5. Tunnel construction - Wikipedia

    en.wikipedia.org/wiki/Tunnel_construction

    Tunnel Construction. Tunnels are dug in types of materials varying from soft clay to hard rock. The method of tunnel construction depends on such factors as the ground conditions, the ground water conditions, the length and diameter of the tunnel drive, the depth of the tunnel, the logistics of supporting the tunnel excavation, the final use and shape of the tunnel and appropriate risk management.

  6. Trap (plumbing) - Wikipedia

    en.wikipedia.org/wiki/Trap_(plumbing)

    Trap with copper drain pipe at underside of firestop packing in two-hour fire-resistance rated concrete floor slab Typical P-trap. Maintaining the water seal is critical to trap operation; traps might dry out, and poor venting can suction or blow water out of the traps. This is usually avoided by venting the drain pipes downstream of the trap ...

  7. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  8. Culvert - Wikipedia

    en.wikipedia.org/wiki/Culvert

    A culvert under the Vistula river levee and a street in Warsaw. Construction or installation at a culvert site generally results in disturbance of the site's soil, stream banks, or stream bed, and can result in the occurrence of unwanted problems such as scour holes or slumping of banks adjacent to the culvert structure.

  9. Shallow foundation - Wikipedia

    en.wikipedia.org/wiki/Shallow_foundation

    These occur when pipes begin to leak from within the slab. Signs of a slab leak range from unexplained dampened carpet spots, to drops in water pressure and wet discoloration on exterior foundation walls. [5] Copper pipes must be lagged (that is, insulated) or run through a conduit or plumbed into the building above the