When.com Web Search

  1. Ads

    related to: retaining wall replacement cost

Search results

  1. Results From The WOW.Com Content Network
  2. Ecology block - Wikipedia

    en.wikipedia.org/wiki/Ecology_block

    When constructing a retaining wall from eco-blocks, a stable foundation is still required. In July 2015, a 70-year-old man in Washington died after an ecology block wall under construction on a sand foundation collapsed, and his legs were crushed by a 3,600-pound (1,600 kg) block. [1] [12]

  3. Revetment - Wikipedia

    en.wikipedia.org/wiki/Revetment

    Asphalt and sandbag revetment with a geotextile filter. A revetment in stream restoration, river engineering or coastal engineering is a facing of impact-resistant material (such as stone, concrete, sandbags, or wooden piles) applied to a bank or wall in order to absorb the energy of incoming water and protect it from erosion.

  4. Mechanically stabilized earth - Wikipedia

    en.wikipedia.org/wiki/Mechanically_stabilized_earth

    The first geosynthetic-reinforced soil walls were built in France in 1970 and 1971. [5] Geosynthetic-reinforced walls have been in use in the United States since 1974. Bell and Steward (1977) describe some of these early applications, which were primarily geotextile wrapped-face walls supporting logging roads in the northwestern United States. [6]

  5. Retaining wall - Wikipedia

    en.wikipedia.org/wiki/Retaining_wall

    A basement wall is thus one kind of retaining wall; however, the term usually refers to a cantilever retaining wall, which is a freestanding structure without lateral support at its top. [2] These are cantilevered from a footing and rise above the grade on one side to retain a higher level grade on the opposite side.

  6. Slurry wall - Wikipedia

    en.wikipedia.org/wiki/Slurry_wall

    A slurry wall is a civil engineering technique used to build reinforced concrete walls in areas of soft earth close to open water, or with a high groundwater table. [1] This technique is typically used to build diaphragm (water-blocking) walls surrounding tunnels and open cuts, and to lay foundations .

  7. Property condition assessment - Wikipedia

    en.wikipedia.org/wiki/Property_condition_assessment

    The executive summary of a PCR is effectively the replacement reserves cost table. The report may be 20-40 pages in length; however, this table summarizes most of the deferred maintenance items found. These tables may be from 8 years in length to 40 or even more. The typical table is 12 years for most CMBS work (loan term plus two years).