Ad
related to: tapping into existing basement drainage board for construction buildings
Search results
Results From The WOW.Com Content Network
The drainage system collects any water entering the basement and drains it to an internally placed sump pump system, which will then pump the water out of the basement. The Federal Emergency Management Agency (FEMA) recommends basement waterproofing with a water alarm and "battery-operated backup pump" as a preventive measure against the high ...
It is critical that a sufficient fall gradient (downward slope) be maintained throughout the drain pipes to keep liquids and entrained solids flowing freely from a building towards the main drain. In situations where a downward slope out of a building en route to a treatment system cannot be created, a special collection sump pit and grinding ...
To install this, the doghouse manhole is lowered to have the two openings to slide over the existing pipe. The concrete is poured in to form the base with slopes from the precast concrete wall down to the half point of the existing pipe. This forms a half bench for the manhole base. The top half of that existing pipe is cut open to form a channel.
The second type is in the form of drainage panels, the rigid polymer core being nubbed, columned, dimpled or a three-dimensional net. With a geotextile on one side it makes an effective drain on the backfilled side of retaining walls, basement walls and plaza decks. The cores are sometimes vacuum formed dimples or stiff 3-D meshes.
A trap primer (or trap seal primer) is a plumbing device or valve that adds water to traps.The water seals in traps are needed to prevent sewer gases from entering buildings, but because this water is exposed to the air, it is subject to evaporation over time in infrequently used floor drains, leading to the release of sewer gas into the environment.
Vertical, metal furring is applied to the wall to create a channel and receive the siding material. In construction, furring (furring strips) are strips of wood or other material applied to a structure to level or raise the surface, to prevent dampness, to make space for insulation, to level and resurface ceilings or walls, [1] or to increase the beam of a wooden ship.
In residential and commercial buildings, these elements are often designed by specialized MEP engineers. MEP's design is important for planning, decision-making, accurate documentation, performance- and cost-estimation, construction, and operating/maintaining the resulting facilities. [1]
In the United States, the International Building Code and ASTM International define Exterior Insulation and Finish System (EIFS) as a non-load-bearing exterior wall cladding system that consists of an insulation board attached either adhesively, mechanically, or both, to the substrate; an integrally reinforced base coat; and a textured protective finish coat.