Search results
Results From The WOW.Com Content Network
The first flight after the 50-hour qualification test, required for a new engine that is the sole source of thrust for a flying testbed, was on 8 December 1955, powering the second pre-production Douglas F4D Skyray, with the J79 in place of its original Westinghouse J40 engine as part of the General Electric development and qualification program.
Other cycle parameters are a bypass ratio of 5.3 and airflow of 240 lb/s (108.9 kg/s). The take-off thrust is 5,600 lbf (24.9 kN), flat-rated to ISA +15°C (30°C, 86°F). Chosen to power the Falcon 2000 in 1990, the engine was also first run in May 1990, [1] and it was first flown on a Boeing 727 testbed on 31 August 1992. [2]
Longman's New Concept English by L. G. Alexander is a popular English language textbook teaching the British rules of English. The course was first published on October 30, 1967. [1] A revised edition, which was "specifically prepared for Chinese learners", [2] came out in 1997. The course consists of four components: The Students' Book; The ...
Engine accessories are driven by the gasifier turboshaft through a perpendicular bevel gear arrangement; a conventional automotive starting motor is used to crank the accessory drive shaft (and gasifier turboshaft). [14] A new nickel-base alloy, designated GMR-235, was developed and patented for the turbine blades in the Whirlfire engine. [15] [16]
Engine compartment of a 1963 Chrysler Turbine automobile. The Chrysler turbine engine is a series of gas turbine engines developed by Chrysler intended to be used in road vehicles. In 1954, Chrysler Corporation disclosed the development and successful road testing of a production model Plymouth sport coupe which was powered by a turbine engine. [1]
[2] The new T408 (GE38-1B) is slated to power the new Sikorsky CH-53K King Stallion three-engined helicopter for the US Marine Corps. It has a power rating of 7,500 shp. [10] The GE38 completed its first round of ground testing in May 2010. [11] Two test engines have completed over 1,000 hours of ground testing by November 2011.
The Block 3 turbine became standard in July 2012 for new production models. By September 2012, all older engines that were undergoing regular maintenance were systematically upgraded to the Block 3 turbine. Engines with a future planned block 4 upgrade would be expected to deliver nearly 10,000 horsepower (7,500 kilowatts). [19]
The first flight with one of these engines took place on 22 February 2007, using a Boeing 747-100, fitted with one GEnx engine in the number 2 (inboard left hand side) position. By fall 2019, General Electric was offering the GEnx-2B, developed for the 747-8, for the revised 767-XF variant based on the 767-400ER, but needed enough volume to ...