Search results
Results From The WOW.Com Content Network
1/2 yes Two tracks are between Velika Plana and Stalać as well as between Đunis and Niš. Modernization and reconstruction is planned to start in 2025 up to high-speed rail of maximum 200 km/h between Belgrade and Niš. 3: Belgrade – Mala Krsna – Velika Plana: 102 km 1 yes 4: Belgrade – Novi Sad – Border with Hungary near Subotica ...
The Serbian government declared a nation-wide day of mourning for 2 November, [1] while the Autonomous Province of Vojvodina and the City of Novi Sad declared three days of mourning in the city. [37] [38] Citizens lit candles and laid flowers at Freedom Square and in front of the railway station. [39] [40]
The 75 km railway for speed up to 200 km/h between Belgrade and Novi Sad, along with a reconstructed railways station building was opened on 19 March 2022 [3] [16] [14] (this part was divided in two sections: as of 2018, the Belgrade–Stara Pazova 34.5 km section was planned to be finished in the end of 2020 and the Stara Pazova–Novi Sad 40. ...
As part of the 2017–2022 construction of the Belgrade–Novi Sad high-speed railway, the station was partially upgraded and reconstructed, including works on the canopy, staircase, plateau, and the addition of a ticket booth and six elevators. The works were to be finished on 28 May 2023, but they extended.
The total travel time between the first and the last stop is 50 minutes. At peak times, trains run every 15 minutes. [3] That line currently contains 13 stations (corresponding to Srbija voz Line 55 [4] and Belgrade public transport Line 100 [5]): Batajnica; Zemun Polje; Zemun; Tošin Bunar; New Belgrade; Belgrade center; Karađorđev Park ...
Belville covers an area of over 14 hectares and consists of 14 residential buildings and two buildings with office space containing 1,858 apartments of 27 different sizes and areas between 31 and 104 m 2, and 333 shops on the ground floor of residential buildings. The underground parking garage and parking place provide parking space for more ...
Map of the urban area of Novi Sad with city quarters, showing the location of Avijatičarsko Naselje. The south-eastern border of Avijatičarsko Naselje is Ulica Oblačića Rada (Oblačića Rada Street), the north-eastern border is Rumenački put (Rumenka Road), and the western border is a future new section of Subotički bulevar (Subotica Boulevard), which will be built in 2007.
The hotel and catering sector accounted for approximately 2.2% of GDP in 2015. [2] Tourism in Serbia employs some 120 000 people, about 4.5% of the country's workforce. [1] In recent years the number of tourists is increasing. In 2019, tourism generated an income of nearly $1.698 billion, hosting 1.85 million tourists.