Search results
Results From The WOW.Com Content Network
1 yes 4: Belgrade – Novi Sad – Border with Hungary near Subotica: 183 km 2 yes High-speed (200 km/h) rail is opened between Belgrade and Novi Sad since 19 March 2022. Double tracking and upgrade to high-speed of 200 km/h is currently in progress from Novi Sad to Subotica (border with Hungary). 5: Niš – Pirot – Border with Bulgaria near ...
As part of the 2017–2022 construction of the Belgrade–Novi Sad high-speed railway, the station was partially upgraded and reconstructed, including works on the canopy, staircase, plateau, and the addition of a ticket booth and six elevators. The works were to be finished on 28 May 2023, but they extended.
The total travel time between the first and the last stop is 50 minutes. At peak times, trains run every 15 minutes. [3] That line currently contains 13 stations (corresponding to Srbija voz Line 55 [4] and Belgrade public transport Line 100 [5]): Batajnica; Zemun Polje; Zemun; Tošin Bunar; New Belgrade; Belgrade center; Karađorđev Park ...
The Serbian government declared a nation-wide day of mourning for 2 November, [1] while the Autonomous Province of Vojvodina and the City of Novi Sad declared three days of mourning in the city. [37] [38] Citizens lit candles and laid flowers at Freedom Square and in front of the railway station. [39] [40]
The area of the lot is smaller, 1.06 ha (2.6 acres) compared to 1.8 ha (4.4 acres), but the total floor area of two planned buildings (one residential, one commercial), remained the same at 38,000 m 2 (410,000 sq ft). The company is obliged to finish the station in Prokop first before it can build anything in New Belgrade.
During the 25th Summer Universiade 2009, which was held in Belgrade from 1 until 12 July 2009, the Belville complex accommodated almost 9,000 athletes from 145 countries. The Universiade was officially opened in the Arena Belgrade, and sports competitions were held in Zemun, Pancevo, Obrenovac, Novi Sad, Smederevo and Vrsac.
The left carriageway between Batajnica and Beška was completed in 2004, and at this stage there was 32.2 km of a full-profile motorway. Construction continued, and the 19.1 km section from Beška to Novi Sad was completed in 2006. The next two sections were Novi Sad – Sirig and Žednik – Bikovo, both of them 10 km long; they opened in 2009.
The hotel and catering sector accounted for approximately 2.2% of GDP in 2015. [2] Tourism in Serbia employs some 120 000 people, about 4.5% of the country's workforce. [1] In recent years the number of tourists is increasing. In 2019, tourism generated an income of nearly $1.698 billion, hosting 1.85 million tourists.