When.com Web Search

  1. Ad

    related to: how long to boil a 750g gammon joint for concrete floor drain diagram

Search results

  1. Results From The WOW.Com Content Network
  2. Trench drain - Wikipedia

    en.wikipedia.org/wiki/Trench_drain

    The drain is characterized by its long length and narrow width, the cross-section of the drain is a function of the maximum flow volume anticipated from the surrounding surface. Channels can range from 1 inch (2.5 cm) to 2 feet (61 cm) in width, while depths can reach up to 4 feet (120 cm).

  3. Gammon (meat) - Wikipedia

    en.wikipedia.org/wiki/Gammon_(meat)

    Sliced gammon. Gammon in British English is the hind leg of pork after it has been cured by dry-salting or brining, [1] and may or may not be smoked. [2] Strictly speaking, a gammon is the bottom end of a whole side of bacon (which includes the back leg); ham is just the back leg cured on its own. [3]

  4. French drain - Wikipedia

    en.wikipedia.org/wiki/French_drain

    A diagram of a traditional French drain. A French drain [1] (also known by other names including trench drain, blind drain, [1] rubble drain, [1] and rock drain [1]) is a trench filled with gravel or rock, or both, with or without a perforated pipe that redirects surface water and groundwater away from an area.

  5. Trap (plumbing) - Wikipedia

    en.wikipedia.org/wiki/Trap_(plumbing)

    Trap with copper drain pipe at underside of firestop packing in two-hour fire-resistance rated concrete floor slab Typical P-trap. Maintaining the water seal is critical to trap operation; traps might dry out, and poor venting can suction or blow water out of the traps. This is usually avoided by venting the drain pipes downstream of the trap ...

  6. What is RAAC concrete? How to tell if school buildings are at ...

    www.aol.com/raac-concrete-tell-school-buildings...

    The term “RAAC” or “Reinforced Autoclave Aerated Concrete” might also be found in original design and drawing plans for buildings constructed between 1950 and 1990. Show comments Advertisement

  7. Damp proofing - Wikipedia

    en.wikipedia.org/wiki/Damp_proofing

    Integral damp proofing in concrete involves adding materials to the concrete mix to make the concrete itself impermeable. [ 4 ] Surface suppressant coating with thin water proof materials such as epoxy resin for resistance to non-pressurized moisture such as rain water or a coating of cement sprayed on such as shotcrete which can resist water ...

  8. Expansion joint - Wikipedia

    en.wikipedia.org/wiki/Expansion_joint

    A expansion joint, or movement joint, is an assembly designed to hold parts together while safely absorbing temperature-induced expansion and contraction of building materials. They are commonly found between sections of buildings , bridges , sidewalks , railway tracks , piping systems , ships , and other structures.

  9. How Long You Should Really Boil Corn on the Cob for ... - AOL

    www.aol.com/long-really-boil-corn-cob-184046951.html

    The answer to how long to boil ears of corn is a general rule of three to five minutes. You want to shuck the corn and remove the husks first, however. The fresher the corn, the shorter amount of ...