When.com Web Search

  1. Ads

    related to: bangkok to chiang mai overnight sleeper train from paris to rome
    • Offres sur les vols

      Courtes pauses ou longs trajets,

      consultez nos offres de vols.

    • Vols Tunis

      Envolez-vous pour Tunis

      pour des vacances inoubliables.

Search results

  1. Results From The WOW.Com Content Network
  2. High-speed rail in Thailand - Wikipedia

    en.wikipedia.org/wiki/High-speed_rail_in_Thailand

    The Thai government announced in September 2019 that it may cancel Bangkok-Chiang Mai high-speed rail project after private investors declined to invest. The cost of the 670 kilometre line is estimated to be 400 billion baht. Japan has turned down the project as a bad investment due to low passenger projections. [37]

  3. Rail transport in Thailand - Wikipedia

    en.wikipedia.org/wiki/Rail_transport_in_Thailand

    The medium phase will include the second section connecting Phitsanulok to Chiang Mai. [97] [98] [99] The Bangkok-Padang Besar route spans 759 kilometers and is divided into three sections and two phases. The medium phase includes the Bangkok-Hua Hin section, which is the first section of the route.

  4. Rail transport in Bangkok - Wikipedia

    en.wikipedia.org/wiki/Rail_transport_in_Bangkok

    Bangkok's first rail line was the private Paknam Railway linking Bangkok to Samut Prakan which opened in 1893. The national railway network was subsequently developed and first opened in 1896, linking Bangkok to Nakhon Ratchasima and then expanding to reach Chiang Mai, Nong Khai, Ubon Ratchathani and Su-ngai Kolok.

  5. I've spent 140 hours on overnight trains and made 7 mistakes ...

    www.aol.com/ive-spent-140-hours-overnight...

    Long-distance train travel can be the journey of a lifetime — so long as you avoid common mistakes. After spending 140 hours traveling nearly 4,000 miles by overnight trains, I've had some regrets.

  6. State Railway of Thailand - Wikipedia

    en.wikipedia.org/wiki/State_Railway_of_Thailand

    The Thai government announced in September 2019 that it may cancel Bangkok-Chiang Mai high-speed rail project after private investors declined to invest. The cost of the 670 kilometre line is estimated to be 400 billion baht. Japan has turned down the project as a bad investment due to low passenger projections. [59]

  7. Northern Line (Thailand) - Wikipedia

    en.wikipedia.org/wiki/Northern_Line_(Thailand)

    Chiang Mai railway station is the northern terminus of the line. The Northern Line is entirely single track, except at stations. Track gauge is 1,000 mm (3 ft 3 + 3 ⁄ 8 in) meter gauge. As the train frequency increases, it is becoming increasingly challenging to operate trains running both direction on the single-line track.