When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Level crossings in the United Kingdom - Wikipedia

    en.wikipedia.org/wiki/Level_crossings_in_the...

    Network Rail is pursuing a policy of closing level crossings at the rate of over 100 a year in the interests of safety, and replacing them with road bridges or footbridges. [22] The number of level crossings on rail lines controlled by Network Rail went from 7,937 in 2003–04 [23] to 6,322 in 2013–14, [24] and 5,887 by 2016–17. [25]

  3. Level crossing - Wikipedia

    en.wikipedia.org/wiki/Level_crossing

    A level crossing is an intersection where a railway line crosses a road, path, or (in rare situations) airport runway, at the same level, [1] as opposed to the railway line or the road etc. crossing over or under using an overpass or tunnel.

  4. Level crossings by country - Wikipedia

    en.wikipedia.org/wiki/Level_crossings_by_country

    As most railways in Taiwan were built during Japanese administration, railway level crossings remain very common and generally built to the same design as Japan, though many urban crossings have been eliminated when the railroads have been moved underground, e.g. segments of the West Coast Line in Taipei City and Kaohsiung City, or moved ...

  5. Level junction - Wikipedia

    en.wikipedia.org/wiki/Level_junction

    A level junction (or in the United Kingdom a flat crossing) is a railway junction that has a track configuration in which merging or crossing railroad lines provide track connections with each other that require trains to cross over in front of opposing traffic at grade (i.e. on the level).

  6. Level Crossing Removal Project - Wikipedia

    en.wikipedia.org/wiki/Level_Crossing_Removal_Project

    The level crossing at Clayton Road, Clayton prior to its removal. As of 2014, there were 176 level crossings left on metropolitan Melbourne's rail network (5 of which involved tram lines) and 228 places where railways had been separated from roads; [15] by the end of the Level Crossing Removal Project (LXRP), 66 level crossings will remain. [16]

  7. Hampton Court branch line - Wikipedia

    en.wikipedia.org/wiki/Hampton_Court_Branch_Line

    There is one level crossing on the line, immediately to the south of the terminus, [3] and the majority of the line is built on an embankment, which reaches a maximum height of 18 ft (5.5 m) above the surrounding ground level. [4] The line is electrified using the 750 V DC third-rail system.

  8. Askern branch line - Wikipedia

    en.wikipedia.org/wiki/Askern_Branch_Line

    The Askern branch line is a railway line which runs in North, South and West Yorkshire in England. The stretch of track runs from Shaftholme Junction north of Doncaster (on the East Coast Main Line between Doncaster and York ), via Askern , Norton and Womersley to Knottingley , where it joins the Pontefract Line .

  9. Glen Huntly railway station - Wikipedia

    en.wikipedia.org/wiki/Glen_Huntly_railway_station

    [16] [17] On 21 June 2021, designs for the rebuilt station were revealed, showing that the level crossings will be removed by lowering the railway line into an approximate 1 km (0.62 mi) trench. [18] The last train stopped at the ground level station on the evening of 31 March 2023 with the station demolished in the following days.