When.com Web Search

  1. Ads

    related to: galvanized beam clamps

Search results

  1. Results From The WOW.Com Content Network
  2. Pipe support - Wikipedia

    en.wikipedia.org/wiki/Pipe_support

    It is rigid vertical type support provide from top only. It consists of clamp, eye nut, tie rod, beam attachment. Selection of rod hanger depends on pipe size, load, temperature, insulation, assembly length etc. As it comes with hinge and clamp, no substantial frictional force comes into play. 3) Rigid strut:

  3. Pipe (fluid conveyance) - Wikipedia

    en.wikipedia.org/wiki/Pipe_(fluid_conveyance)

    They are typically temporarily supported in the steel structure using beam clamps, straps, and small hoists until the pipe supports are attached or otherwise secured. An example of a tool used for installation for a small plumbing pipe (threaded ends) is the pipe wrench. Small pipe is typically not heavy and can be lifted into place by the ...

  4. Scaffolding - Wikipedia

    en.wikipedia.org/wiki/Scaffolding

    Scaffolding for rehabilitation in Madrid, Spain [1] Scaffolding for renovation on the Virgin Mary statue, Santiago de Chile, Chile.. Scaffolding, also called scaffold or staging, [2] is a temporary structure used to support a work crew and materials to aid in the construction, maintenance and repair of buildings, bridges and all other human-made structures.

  5. Pipe clamp - Wikipedia

    en.wikipedia.org/wiki/Pipe_clamp

    A pipe clamp is a type of clamp often employed in piping, woodworking, and cabinet shops. Pipe clamps for woodwork or cabinet shops are usually composed of commercially manufactured clamp heads or "jaws" and a length of common threaded pipe. [1] [2] The capacity of the clamp is determined by the length of the pipe used.

  6. Bolted joint - Wikipedia

    en.wikipedia.org/wiki/Bolted_joint

    Locking mechanisms keep bolted joints from coming loose. They are required when vibration or joint movement will cause loss of clamp load and joint failure, and in equipment where the security of bolted joints is essential. A prevalent test for the self-loosening behaviour is the Junker test. Jam nuts

  7. List of construction methods - Wikipedia

    en.wikipedia.org/wiki/List_of_Construction_methods

    Beam soffits: 8–14 days. Beam props: 15–21 days. This consists of a vertical mold of the desired shape and size matching the column to be poured. To keep the material thickness to a minimum, horizontal steel or timber clamps (or yokes) are used for batch filling and at varying centers for filling that is completed in one pour.