Ads
related to: indoor ventilation architecture examples residential
Search results
Results From The WOW.Com Content Network
For residential buildings, which mostly rely on infiltration for meeting their ventilation needs, a common ventilation rate measure is the air change rate (or air changes per hour): the hourly ventilation rate divided by the volume of the space (I or ACH; units of 1/h). During the winter, ACH may range from 0.50 to 0.41 in a tightly air-sealed ...
Demand controlled ventilation (DCV) is a feedback control method to maintain indoor air quality that automatically adjusts the ventilation rate provided to a space in response to changes in conditions such as occupant number or indoor pollutant concentration. The most common indoor pollutants monitored in DCV systems are carbon dioxide and ...
The ventilation system of a regular earthship Dogtrot houses are designed to maximise natural ventilation. A roof turbine ventilator, colloquially known as a 'Whirly Bird' is an application of wind driven ventilation. Passive ventilation is the process of supplying air to and removing air from an indoor space without using mechanical systems.
The stack effect is used both in traditional buildings and modern green architecture. Examples of traditional usage include the wind towers common in Middle Eastern architecture, which capture and direct cooler breezes into the building while expelling hot air to maintain comfortable indoor temperatures. [9]
Ventilation on the downdraught system, by impulsion, or the 'plenum' principle, applied to schoolrooms (1899) Natural ventilation is the ventilation of a building with outside air without using fans or other mechanical systems. It can be via operable windows, louvers, or trickle vents when spaces are small and the architecture permits.
Predictive controls have a ‘prediction horizon’ which is the amount of time ahead that an OCC will need to change a setpoint or ventilation rate to achieve a certain temperature or indoor air quality level. The needed prediction horizon for an OCC will vary depending on the response time of the building. [9]