Search results
Results From The WOW.Com Content Network
The primary intended use of the Phase A Space Shuttle was supporting the future space station, ferrying a minimum crew of four and about 20,000 pounds (9,100 kg) of cargo, and being able to be rapidly turned around for future flights, with larger payloads like space station modules being lifted by the Saturn V.
The design of the core stage was intended to make use of knowledge and experience gained from the Space Shuttle program, similarly to the rest of the Space Launch System. This is reflected in aspects such as the rocket's 8.4 m (27.6 ft) diameter, identical to that of the Space Shuttle 's external tank , while feedlines and ducts are designed to ...
The 5-segment SRB, which would have required little change to the current shuttle infrastructure, would have allowed the space shuttle to carry an additional 20,000 lb (9,100 kg) of payload in a 51.6°-inclination orbit, eliminate the dangerous "Return-to-Launch Site" (RTLS) and "Trans-Oceanic Abort" (TAL) modes, and, by using a so-called "dog ...
In 1984, with the Space Shuttle in service, a team based at the Johnson Space Center (JSC) made a feasibility study for NASA's return to the Moon.It anticipated later studies in using NASA's planned infrastructure – the Shuttle, a Shuttle-derived heavy lift vehicle, a space station, and an orbital transfer vehicle – to build a permanent 18-crew Moon base sometime between 2005 and 2015.
Shuttle Mission Simulator (SMS) was an umbrella term for three separate simulators for training Space Shuttle crews at the Johnson Space Center (JSC). The simulators were the MBS ( Motion Base Simulator ), the FBS ( Fixed Base Simulator ), and the GNS (an acronym for its original name, Guidance and Navigation Simulator [ 1 ] ).
The Mobile Launcher Platform-1 on top of a crawler-transporter. A mobile launcher platform (MLP), also known as mobile launch platform, is a structure used to support a large multistage space vehicle which is assembled (stacked) vertically in an integration facility (e.g. the Vehicle Assembly Building) and then transported by a crawler-transporter (CT) to a launch pad.
The Space Shuttle external tank (ET) carried the propellant for the Space Shuttle Main Engines, and connected the orbiter vehicle with the solid rocket boosters. The ET was 47 m (153.8 ft) tall and 8.4 m (27.6 ft) in diameter, and contained separate tanks for liquid oxygen and liquid hydrogen.
Then they schedule their launches using the two Space Shuttles available (Atlantis and Discovery, [6] though the initial release used the Space Shuttle Challenger), and have their budget approved. In the final stage of the planning phase the player can create a simulated station with an unlimited number of parts, and without dealing with the ...