Ads
related to: radiant heating cost estimate chart for construction
Search results
Results From The WOW.Com Content Network
The most basic element of a cost estimate and therefore the cost database is the estimate line item or work item. [3] An example is "Concrete, 4000 psi (30 MPa)," which is the description of the item. In the cost database, an item is a row or record in a table (of items) and the description is a column or field for that record.
Operative temperature is used in heat transfer and thermal comfort analysis in transportation and buildings. [10] Most psychrometric charts used in HVAC design only show the dry bulb temperature on the x-axis(abscissa), however, it is the operative temperature which is specified on the x-axis of the psychrometric chart illustrated in ANSI/ASHRAE Standard 55 – Thermal Environmental Conditions ...
Although the main heating is accomplished by radiation and convection from the inner face of the wall, two vents in the wall also allow daytime heating by the natural convection loop. According to data collected in the winters of 1975-1976 and 1976–1977, the Trombe wall system reduced the heating costs respectively by 76% and 84%. [3]
Radiant heating and cooling is a category of HVAC technologies that exchange heat by both convection and radiation with the environments they are designed to heat or cool. There are many subcategories of radiant heating and cooling, including: "radiant ceiling panels", [ 1 ] "embedded surface systems", [ 1 ] "thermally active building systems ...
Uniformat is a standard for classifying building specifications, cost estimating, and cost analysis in the U.S. and Canada. The elements are major components common to most buildings. The system can be used to provide consistency in the economic evaluation of building projects.
A chilled beam is a type of radiation/convection HVAC system designed to heat and cool large buildings through the use of water. [1] This method removes most of the zone sensible local heat gains and allows the flow rate of pre-conditioned air from the air handling unit to be reduced, lowering by 60% to 80% the ducted design airflow rate and the equipment capacity requirements.