Peak demand is typically characterized as annual, daily or seasonal and has the unit of power. [1] Peak demand, peak load or on-peak are terms used in energy demand management describing a period in which electrical power is expected to be provided for a sustained period at a significantly higher than average supply level. Peak demand ...
In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...
Additionally, the capacity factor can be subject to regulatory constraints and market forces, potentially affecting both its fuel purchase and its electricity sale. The capacity factor is often computed over a timescale of a year, averaging out most temporal fluctuations. However, it can also be computed for a month to gain insight into ...
Capacity factor is a measure of the output of a power plant compared to the maximum output it could produce. Capacity factor is often defined as the ratio of average load to capacity or the ratio of average load to peak load in a period of time. A higher load factor is advantageous because a power plant may be less efficient at low load factors ...
The diversified load is the total expected power, or "load", to be drawn during a peak period by a device or system of devices. The maximum system load is the combination of each device's full load capacity, utilization factor, diversity factor, demand factor, and the load factor. This process is referred to as load diversification.
This is the peak in the load profile divided by the full load of the device. Example: If a residence has equipment which could draw 6,000 W when all equipment was drawing a full load, drew a maximum of 3,000 W in a specified time, then the demand factor = 3,000 W / 6,000 W = 0.5
Typically, a storage device for space heating or a water heater will be connected to this circuit. The electricity is turned on after the evening peak demand, and turned off in the morning before the morning peak demand starts. The cost for such power is less than the "on-demand" power which makes it worthwhile for the user to subscribe to it.
Hydro is load following and managing the peaks, with some response from base load thermal. Note that total generation is always greater than the total BPA load because most of the time BPA is a net exporter of energy. The BPA load does not include scheduled energy to other balancing authority areas. [6]