The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...
An integrated framing assembly (IFA) is a specialty product in insulating concrete form (ICF) construction. First developed in 2006 by Stala Integrated Assemblies, LLC, and thus also known colloquially as "Stala frames," these assemblies were designed for large commercial ICF construction.
In the United States, the International Building Code and ASTM International define Exterior Insulation and Finish System (EIFS) as a non-load-bearing exterior wall cladding system that consists of an insulation board attached either adhesively, mechanically, or both, to the substrate; an integrally reinforced base coat; and a textured protective finish coat.
Rastra is a registered tradename for a particular insulating concrete form (ICF) construction system, Rastra created the name Insulating COMPOUND Concrete Form (ICCF), used to make walls for buildings. It is one of the earliest such products, first patented in 1965 in Austria.
Waffle slab foundations adhere to International Building Code requirements. By 2008, most states put into effect the changes adopted in the 2006 IBC and, in regards to foundations, the on-grade mat foundation has become a more attractive design because, as an engineered system, it already accommodates the 2008 design recommendations, and required no major modifications to bring it into compliance.
A structural insulated panel, or structural insulating panel, (SIP), is a form of sandwich panel used as a building material in the construction industry. SIP is a sandwich structured composite , consisting of an insulating layer of rigid core sandwiched between two layers of structural board.
In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4] Precast: The slabs are made somewhere else and then brought to the site and assembled. [4] Pre-fabricated: The reinforcements are integrated into the slab while being manufactured, without needing to reinforce the assembly on site ...
Tunnel forms are large, room size forms that allows walls and floors to be cast in a single pour. With multiple forms, the entire floor of a building can be done in a single pour. Tunnel forms require sufficient space exterior to the building for the entire form to be slipped out and hoisted up to the next level.