Search results
Results From The WOW.Com Content Network
Administrative controls do not remove hazards, but limit or prevent people's exposure to the hazards, such as completing road construction at night when fewer people are driving. [5] Administrative controls are ranked lower than elimination, substitution, and engineering controls because they do not directly remove or reduce workplace hazards.
The primary requirement of a control system is that it maintains the level and kind of output necessary to achieve the system's objectives. [5] It is usually impractical to control every feature and condition associated with the system's output. Therefore, the choice of the controlled item (and appropriate information about it) is extremely ...
The control action is the switching on/off of the boiler, but the controlled variable should be the building temperature, but is not because this is open-loop control of the boiler, which does not give closed-loop control of the temperature. In closed loop control, the control action from the controller is dependent on the process output.
Engineering controls is the third of five members of the hierarchy of hazard controls, which orders control strategies by their feasibility and effectiveness. Engineering controls are preferred over administrative controls and personal protective equipment (PPE) because they are designed to remove the hazard at the source, before it comes in ...
Level 2 contains the supervisory computers, which collate information from processor nodes on the system, and provide the operator control screens. Level 3 is the production control level, which does not directly control the process, but is concerned with monitoring production and monitoring targets; Level 4 is the production scheduling level.
Risk control, also known as hazard control, is a part of the risk management process in which methods for neutralising or reduction of identified risks are implemented. . Controlled risks remain potential threats, but the probability of an associated incident or the consequences thereof have been significantly red
Level 3 is the production control level, which does not directly control the process, but is concerned with monitoring production and monitoring targets; Level 4 is the production scheduling level. Levels 1 and 2 are the functional levels of a traditional DCS, in which all equipment are part of an integrated system from a single manufacturer ...
Control systems play a critical role in space flight.. Control engineering, also known as control systems engineering and, in some European countries, automation engineering, is an engineering discipline that deals with control systems, applying control theory to design equipment and systems with desired behaviors in control environments. [1]