Search results
Results From The WOW.Com Content Network
For a VTOL two-seater, a 55 kW (74 hp) turbogenerator would weigh 85 kg (187 lb) with fuel for 2.5 h of endurance instead of 1 ton of batteries. A demonstrator ran in 2016-17 and ground-testing began in the second half of 2018 before flight testing in the second half of 2019 and first delivery in the first half of 2020.
250 kW steam turbine generator set (1910) 500 MW Siemens multi stage steam turbine with generator set (rear, red) Parsons first 1 MW steam turbine driven "Turbogenerator" (made 1900 for a plant in Elberfeld, Germany) Ottó Bláthy in the armature of a Ganz turbo generator (1904) Small RP4 steam turbo generator set 500W/24V for a steam locomotive: alternator (left) + turbine (right)
Main page; Contents; Current events; Random article; About Wikipedia; Contact us; Pages for logged out editors learn more
On 1 May 1932, the first stage of the turbogenerator plant was commissioned. Its design capacity was consistent with production of 1.5 million kW per year of steam turbines. Four workshops were put into service: blade, tool, workshop of different parts and workshop of discs and diaphragms. Achievements in 1932 included:
The GE27 was developed in the early 1980s under the "Modern Technology Demonstrator Engines" (MTDE) program sponsored by the United States Army Aviation Applied Technology Directorate. [2]
PW610F fan, human hand for scale in inset. The 2,500 lbf (11 kN) thrust PW625F demonstrator engine was first run on 31 October 2001. [1] It flew in late 2002. [2]In 2002, the PW610F was selected for the Eclipse 500 twinjet, replacing the EJ22 as Williams was unable to reach sufficient reliability.
The General Electric F414 is an American afterburning turbofan engine in the 22,000-pound (98 kN) thrust class produced by GE Aerospace (formerly GE Aviation). The F414 originated from GE's widely used F404 turbofan, enlarged and improved for use in the Boeing F/A-18E/F Super Hornet.
T-s diagram for the ideal/real ORC. The working principle of the organic Rankine cycle is the same as that of the Rankine cycle: the working fluid is pumped to a boiler where it is evaporated, passed through an expansion device (turbine, [3] screw, [4] scroll, [5] or other expander), and then through a condenser heat exchanger where it is finally re-condensed.