Ads
related to: kennedy space shuttle schedule
Search results
Results From The WOW.Com Content Network
The program flew a total of 355 people representing 16 countries, and with 852 total shuttle fliers. [4] The Kennedy Space Center served as the landing site for 78 missions, while 54 missions landed at Edwards Air Force Base in California and one mission landed at White Sands, New Mexico. [5]
The Space Shuttle program was the fourth human spaceflight program carried out by the U.S. National Aeronautics and Space Administration (NASA), which accomplished routine transportation for Earth-to-orbit crew and cargo from 1981 to 2011.
The Space Shuttle Atlantis is seen on launch pad 39A at the NASA Kennedy Space Center shortly after the rotating service structure was rolled back on November 15, 2009. As the Space Shuttle was being designed, NASA received proposals for building alternative launch-and-landing sites at locations other than KSC, which demanded study.
After working to improve the booster design and creating new management practices to improve safety, NASA relaunched shuttle flights on Sept. 29, 1988, when Discovery lifted off from the space center.
Kennedy Space Center, operated by NASA, has two launch complexes on Merritt Island comprising four pads—two active, one under lease, and one inactive.From 1967 to 1975, it was the site of 13 Saturn V launches, three crewed Skylab flights and the Apollo–Soyuz; all Space Shuttle flights from 1981 to 2011, and one Ares 1-X flight in 2009.
Previous Kennedy Space Center (KSC) Master Plan recommendations—in 1966, 1972, and 1977—noted that an expansion of KSC's vertical launch capacity could occur when the market demand existed. The 2007 Site Evaluation Study recommended an additional vertical launch pad, Launch Complex 49 (LC-49), to be sited north of existing LC-39B.