When.com Web Search

  1. Ads

    related to: rainproof concrete after pouring floor plan over garage roof

Search results

  1. Results From The WOW.Com Content Network
  2. Voided biaxial slab - Wikipedia

    en.wikipedia.org/wiki/Voided_biaxial_slab

    Concrete is poured around these plastic forms to create internal voids in the slab A voided biaxial slab installation in Turkey. Voided biaxial slabs, sometimes called biaxial slabs or voided slabs, are a type of reinforced concrete slab which incorporates air-filled voids to reduce the volume of concrete required.

  3. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  4. Hydrophobic concrete - Wikipedia

    en.wikipedia.org/wiki/Hydrophobic_concrete

    The coating is applied between 1.25-1.5 lb per square yard and continues until the whole surface is covered. If the surface requires another coat, it must be applied within forty eight hours of the initial application of the hydrophobic mixture. Once applied, the concrete must cure in a moist environment two to three hours after the application.

  5. Concrete slab - Wikipedia

    en.wikipedia.org/wiki/Concrete_slab

    After the concrete has set the wood may be removed. Formwork can also be permanent, and remain in situ post concrete pour. For large slabs or paths that are poured in sections, this permanent formwork can then also act as isolation joints within concrete slabs to reduce the potential for cracking due to concrete expansion or movement.

  6. Cast-in-place concrete - Wikipedia

    en.wikipedia.org/wiki/Cast-in-place_concrete

    Cast-in-place concrete or Cast-in-situ concrete is a technology of construction of buildings where walls and slabs of the buildings are cast at the site in formwork. [1] This differs from precast concrete technology where slabs are cast elsewhere and then brought to the construction site and assembled. [ 2 ]

  7. Waffle slab - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab

    First the supports are built, then the pods are arranged in place, and finally the concrete is poured. This process may occur in three different approaches, however the basic method is the same in each: In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4]

  1. Ad

    related to: rainproof concrete after pouring floor plan over garage roof