The first geothermal area to be exploited for commercial electricity generation was The Geysers, a complex of 22 geothermal power stations located in Sonoma and Lake counties of California, which was commissioned in September 1960. [1]
The largest group of geothermal power plants in the world is located at The Geysers, a geothermal field in California, United States. [42] As of 2021, five countries ( Kenya , Iceland , El Salvador , New Zealand , and Nicaragua) generate more than 15% of their electricity from geothermal sources.
The Sonoma Calpine 3 power plant is one of 22 power plants at The Geysers in the United States. This is a list of operational geothermal power stations with a current installed capacity of at least 10 MW. The Geysers in California, United States is the largest geothermal power station in the world with a nameplate capacity of 1,590 MW and an annual generation of 6,516 GWh in 2018. Geothermal ...
The Makiling–Banahaw (Mak–Ban) Geothermal Power Plant was developed to harness the geothermal resources of the Mak–Ban or Bulalo field. The Chevron Geothermal Philippine Holdings, Inc., under a service contract with the state-owned National Power Corporation (NPC) commissioned the geothermal station field in 1979. [2]
Imperial Valley Geothermal Project is a complex of eleven geothermal power stations located in the Salton Sea Geothermal Field, along the southeastern shore of the Salton Sea in the Imperial Valley of California. It is the second largest geothermal field [clarification needed] in the United States after The Geysers in Northern California ...
The first geothermal power plant in the Tiwi region opened in 1979, while two other plants followed in 1980 and 1982. [58] The Tiwi geothermal field is located about 450 km from Manila. [61] The three geothermal power plants in the Tiwi region produce 330 MWe, putting the Philippines behind the United States and Mexico in geothermal growth. [62]
Work at the geothermal field site on the first stage of the plant (82 MW) commenced in July 2011 [7] and the plant became operational in September, 2013, one month later than scheduled. [2] [8] The power station is a binary plant, supplied under an EPC contract by Ormat. [9]
Nga Awa Purua is New Zealand's second largest geothermal power station [2] and the steam turbine is the largest geothermal turbine in the world. [3] The power station is a joint venture between Mercury Energy (75%) and the Tauhara North No 2 Trust (25%), who represent about 800 owners affiliated to Ngati Tahu. [4]