Search results
Results From The WOW.Com Content Network
System Map, including lines under construction. This is a list of all stations on the Mass Rapid Transit (MRT) system in Singapore. [1] As of 2024, the Singapore MRT has approximately 242.6 km (150.7 mi) of system length spread across six operational lines, the 19th highest in the world.
In addition to the previously announced alignment of the Thomson–East Coast Line, an extension has been proposed to connect it to Changi Airport, with the line passing through Terminal 5, and eventually absorbing the existing Changi Airport branch on the East–West Line. With such an extension, there would be a direct connection between ...
In 2014, the station will be expanded to four platforms to increase frequency for the Changi Airport branch. On 25 May 2019, it was announced that Tanah Merah station would interchange with the Thomson–East Coast line (TEL) when TEL takes over the Changi Airport branch following its extension to Changi Airport Terminal 5 by 2040.
The contract for the construction of twin-bored tunnels from Changi Airport station to Changi Airport Terminal 5 was awarded to Shanghai Tunnel Engineering Co (Singapore) Pte Ltd for S$321.7 million (US$240.07 million). [42] [43] Construction required tunnelling under a closed runway east of Terminal 2, which was completed in November 2022. [44]
The Thomson–East Coast Line (TEL) is a high-capacity Mass Rapid Transit (MRT) line in Singapore.Coloured brown on the rail map, it is fully underground. When fully completed, the sixth line on the country's MRT network will serve 32 stations around 43 kilometres (27 mi) in length, becoming one of the world's longest driverless rapid transit lines.
The Downtown Line (DTL) is a medium-capacity Mass Rapid Transit (MRT) line in Singapore.It runs from Bukit Panjang station in the north-west of the country towards Expo station in the east via a loop around the city-centre.
On 26 June 2023, Capitaland announced that besides 1 Science Park Drive, 5 and 7 Science Park Drive will also be integrated into a new S$1.37 billion life sciences and innovation campus named Geneo. Opened in 2024, 7 Science Park Drive was redeveloped into a mixed-use development comprising workspaces and the 250-room Citadines Science Park ...
When Terminal 5 is completed, it is expected to handle an additional 50 million passengers per year. [2] The airport is located approximately 25 km (16 mi) east north-east of the city's commercial centre, on a 24-square-kilometre (9.3 sq mi) 2,400 hectares (5,900 acres) site on the easternmost point of Singapore Island. [3]