Search results
Results From The WOW.Com Content Network
A PMCS is required before a vehicle can be dispatched and before a piece of equipment, such as a weapon, can be issued. A PMCS sheet, as listed above, for vehicles is called a DA 5988E. This sheet is used to write down any deficiency found during the PMCS procedure. [2]
At the beginning of the 1950, the company was renamed Ardex Chemie GmbH. The company managed to reduce the drying periods of sub-floor smoothing compounds. This invention enabled the company to manufacture "quick-setting" screeds, which become fully usable after 24 hours, i.e. installation of the finish top cover is possible after 24 hours.
Disruptive Pattern Material (DPM) is the commonly used name of a camouflage pattern used by the British Armed Forces as well as many other armed forces worldwide, particularly in former British colonies. The main variants of DPM are a four-colour woodland pattern, and desert patterns in two, three or four colours.
The Joint Electronics Type Designation System (JETDS), which was previously known as the Joint Army-Navy Nomenclature System (AN System. JAN) and the Joint Communications-Electronics Nomenclature System, is a method developed by the U.S. War Department during World War II for assigning an unclassified designator to electronic equipment.
The regiment operating the Grey Eagle lessens their dependence on Air Force drones for providing reconnaissance and strike capabilities to special operations teams. The MQ-1C has greater capabilities than RQ-7 Shadow UAVs operated by the regiment by extending their range of coverage beyond a specific area of operations. [35]
Sentinel-1 is the first of the Copernicus Programme satellite constellations conducted by the European Space Agency. [4] The mission was originally composed of a constellation of two satellites, Sentinel-1A and Sentinel-1B, which shared the same orbital plane.
It can often be seen as a thin line in the mortar near ground level. To create a continuous barrier, pieces of DPC or DPM may be sealed together. In addition, the DPC may be sealed to the DPM around the outside edges of the ground floor, completely sealing the inside of the building from the damp ground around it.
Test coverage in the test plan states what requirements will be verified during what stages of the product life. Test coverage is derived from design specifications and other requirements, such as safety standards or regulatory codes, where each requirement or specification of the design ideally will have one or more corresponding means of verification.