The power plant is one of the coal based power plants of NTPC. The coal for the power plant is sourced from Dipika Mines of South Eastern Coalfields Limited . The project has an installed capacity of 2980 MW consisting of two stages, stage one which got commissioned late was of 3 units of 660 MW each involving super-critical boilers technology ...
The majority of the world's thermal power stations are driven by steam turbines, gas turbines, or a combination of the two. The efficiency of a thermal power station is determined by how effectively it converts heat energy into electrical energy, specifically the ratio of saleable electricity to the heating value of the fuel used.
Super Thermal Power Stations or Super Power Station are a series of ambitious power projects planned by the Government of India. With India being a country of chronic power deficits, the Government of India has planned to provide 'power for all' by the end of the eleventh plan .
Rajiv Gandhi Thermal Power Station is located at Khedar village near Barwala in Hisar district of Haryana, India. The power plant is one of the coal based power plants of Haryana Power Generation Corporation Limited (HPGCL). The Engineering, procurement and construction (EPC) contract was given to Reliance Infrastructure. [1]
The Vindhyachal Thermal Power Station is located in Singrauli district in the Indian state of Madhya Pradesh. One of the coal-fired power stations of NTPC , it is the largest power station in India, and the 10th largest coal -fired power station in the world, with an installed capacity of 4,760 MW with total of 4783 MW. [ 1 ]
Thermal power is the largest source of power in India. There are different types of thermal power plants based on the fuel that are used to generate the steam such as coal, gas, and diesel, natural gas. About 71% of electricity consumed in India is generated by thermal power plants. [8]
Dr Narla Tata Rao Thermal Power Plant is also known as Vijayawada Thermal Power Plant. It was developed under 4 stages, with the project cost of Rs 193 Crores and Rs 511 Crores respectively. Again with an investment of RS 840 Crores 2 units were commissioned under III Stage. The seventh unit of 500 MW was commissioned in 2009.