When.com Web Search

  1. Ads

    related to: maximum demand charges for electricity in indiana calculator schedule 4

Search results

  1. Results From The WOW.Com Content Network
  2. Peak demand - Wikipedia

    en.wikipedia.org/wiki/Peak_demand

    Loch Mhor is used to generate hydro-electric energy at peak demand or in an emergency. Peak demand on an electrical grid is the highest electrical power demand that has occurred over a specified time period (Gönen 2008). Peak demand is typically characterized as annual, daily or seasonal and has the unit of power. [1]

  3. Maximum demand indicator - Wikipedia

    en.wikipedia.org/wiki/Maximum_demand_indicator

    Maximum Demand Indicator (MDI) is an instrument for measuring the maximum amount [clarification needed] of electrical energy required by a specific consumer during a given period of time. [1] MDI instruments record the base load requirement of electrical energy .

  4. Electricity retailing - Wikipedia

    en.wikipedia.org/wiki/Electricity_retailing

    Commercial and industrial consumers normally have more complex pricing schemes. These require meters that measure the energy usage in time intervals (such as a half-hour) to impose charges based on both the amount of energy consumed and the maximum rate of consumption, i.e. the maximum demand. This is usually called peak demand charge.

  5. Load factor (electrical) - Wikipedia

    en.wikipedia.org/wiki/Load_factor_(electrical)

    In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...

  6. Net metering - Wikipedia

    en.wikipedia.org/wiki/Net_metering

    The price that electricity will be sold at is being formulated during the consultation process. [50] Poland has introduced net metering for private and commercial renewable energy sources of up to 50 kW in 2015. [51] Under this legislation energy sent to grid must be used within one year from feed-in, otherwise it is considered as lost.

  7. Cost of electricity by source - Wikipedia

    en.wikipedia.org/wiki/Cost_of_electricity_by_source

    The levelized cost of electricity (LCOE) is a metric that attempts to compare the costs of different methods of electricity generation consistently. Though LCOE is often presented as the minimum constant price at which electricity must be sold to break even over the lifetime of the project, such a cost analysis requires assumptions about the value of various non-financial costs (environmental ...

  8. Energy demand management - Wikipedia

    en.wikipedia.org/wiki/Energy_demand_management

    Managing energy, peak demand and bills in community level may be more feasible and viable, because of the collective purchasing power, the bargaining power, more options in energy efficiency or storage, [24] more flexibility and diversity in generating and consuming energy at different times, e.g. using PV to compensate day time consumption or ...

  9. Utility ratemaking - Wikipedia

    en.wikipedia.org/wiki/Utility_ratemaking

    Utility ratemaking is the formal regulatory process in the United States by which public utilities set the prices (more commonly known as "rates") they will charge consumers. [1] Ratemaking, typically carried out through "rate cases" before a public utilities commission , serves as one of the primary instruments of government regulation of ...