When.com Web Search

  1. Ads

    related to: ice melting cables for gutters cost chart example

Search results

  1. Results From The WOW.Com Content Network
  2. Snowmelt system - Wikipedia

    en.wikipedia.org/wiki/Snowmelt_system

    A heated sidewalk in Holland, Michigan Installation of a geothermal snowmelt system on a street in Reykjavík, Iceland.. A snowmelt system prevents the build-up of snow and ice on cycleways, walkways, patios and roadways, or more economically, only a portion of the area such as a pair of 2-foot (0.61 m)-wide tire tracks on a driveway or a 3-foot (0.91 m) center portion of a sidewalk, etc.

  3. Trace heating - Wikipedia

    en.wikipedia.org/wiki/Trace_heating

    Placement of heat trace cable on roofs or in gutters to melt ice during winter months. When used in gutters the cable is not meant to keep the gutters free of ice or snow, but only to provide a free path for the melted water to get off the roof and down the downspout or drain piping.

  4. Snow removal - Wikipedia

    en.wikipedia.org/wiki/Snow_removal

    De-icing is defined as removal of existing snow, ice or frost from a roadway, airport runway, roof, or other surface. It includes both mechanical means, such as plowing, vacuuming or scraping, and chemical means, such as application of salt or other ice-melting chemicals.

  5. Underground heating cables melt snow from your driveway - AOL

    www.aol.com/news/underground-heating-cables-melt...

    For premium support please call: 800-290-4726 more ways to reach us

  6. Ice dam (roof) - Wikipedia

    en.wikipedia.org/wiki/Ice_dam_(roof)

    An ice dam is an ice build-up on the eaves of sloped roofs of heated buildings that results from melting snow under a snow pack reaching the eave and freezing there. Freezing at the eave impedes the drainage of meltwater, which adds to the ice dam and causes backup of the meltwater, which may cause water leakage into the roof and consequent ...

  7. Phase-change material - Wikipedia

    en.wikipedia.org/wiki/Phase-change_material

    Ice, for example, requires 333.55 J/g to melt, but then water will rise one degree further with the addition of just 4.18 J/g. Water/ice is therefore a very useful phase change material and has been used to store winter cold to cool buildings in summer since at least the time of the Achaemenid Empire.

  1. Ads

    related to: ice melting cables for gutters cost chart example