Ads
related to: red line subway boston map location directions
Search results
Results From The WOW.Com Content Network
The Red Line was the last of the four original Boston subway lines (the others being the Green, Orange, and Blue Lines, opened in 1897, 1901, and 1904, respectively) to be constructed. Construction of the Cambridge tunnel , connecting Harvard Square to Boston, was delayed by a dispute over the number of intermediate stations to be built along ...
Stylized map of the Boston subway system from 2013. The map does not reflect changes since, including the 2014 opening of Assembly station, the 2018 start of SL3 service, and the 2022 opening of the Green Line Extension. This is a list of MBTA subway stations in Boston and surrounding municipalities.
The color-branded lines consist of three heavy rail lines (Red, Orange, and Blue), one branched light rail system , and a short light rail line (the Mattapan Line, colored as part of the Red Line). All except the Ashmont–Mattapan line operate in tunnels in the downtown area, but no route operates entirely underground, and only 31 out of the ...
2 side platforms (Orange Line) 2 side platforms (Red Line) Tracks: 2 (Orange Line) 2 (Red Line) Connections: MBTA bus: 7, 11, 501, 504, 505 Green Line and MBTA bus 43 at Park Street (via Winter Street Concourse) Construction; Structure type: Underground: Platform levels: 2: Accessible: Yes: History; Opened: November 30, 1908 (Orange Line) April ...
Broadway station is a subway station in Boston, Massachusetts. It serves the MBTA's Red Line. It is located at the intersection of Dorchester Avenue and Broadway in South Boston. It was opened on December 15, 1917, as part of the Dorchester Extension from Downtown Crossing (formerly Washington station) to Andrew. The station has a single island ...
A diversion was in place as part of a bridge project, suspending service between Broadway Station and Ashmont and North Quincy stations.
I-4 This placed increased pressure on a Red Line extension at least as far as a park-and-ride station at Alewife Brook Parkway to handle Route 2 traffic. By the mid-1970s, the project was split into two phases: an all-subway extension to Arlington Heights via Alewife, with a later extension to Route 128. [6]: I-5
A Silver Line bus at South Station in March 2023. South Station has three underground levels. The Red Line runs under Summer Street at the lowest level, with two side platforms serving the line's two tracks. The Silver Line runs under Atlantic Avenue on the middle level, with two side platforms serving the busway.