Search results
Results From The WOW.Com Content Network
A parts kit is a collection of weapon (notably firearm) parts that, according to the Bureau of Alcohol, Tobacco, Firearms, and Explosives (ATF), "is designed to or may be readily be assembled, completed, converted, or restored to expel a projectile by the action of an explosive."
Some air conditioning equipment manufacturers install crankcase heaters either in the compressor (insertion type), or mount them externally around the base of the compressor (bellyband type). The two wires of the heater are wired directly to the input side of the contact from the main power supply, and power is always supplied to the heater.
The efficiency of air conditioners is often rated by the seasonal energy efficiency ratio (SEER), which is defined by the Air Conditioning, Heating and Refrigeration Institute in its 2008 standard AHRI 210/240, Performance Rating of Unitary Air-Conditioning and Air-Source Heat Pump Equipment. [61]
Central, "all-air" air-conditioning systems (or package systems) with a combined outdoor condenser/evaporator unit are often installed in North American residences, offices, and public buildings, but are difficult to retrofit (install in a building that was not designed to receive it) because of the bulky air ducts required. [32] (Minisplit ...
In a car equipped with air conditioning, outside air, or cabin air if the recirculation flap has been set to close the external air passages, is first forced, often after being filtered by a cabin air filter, through the air conditioner's evaporator coil. This can be thought of as a heater core filled with very cold liquid that is undergoing a ...
The AE86 was available with a naturally aspirated 4A-GE 1,587 cc (1.6 L; 96.8 cu in) inline-four engine, a DOHC four-valve-per-cylinder motor, in Japan and Europe, which was also used in the first-generation MR2 G Limited (AW11), Corona GT (AT141), Celica 1600GT-R (AA63) and Carina 1600GTR (AA63) (Japan only) with a compression ratio of 9.4:1.
The battle group's stay was short, and on 7 January 1959 it was relieved from assignment to the 24th Infantry Division and assigned to the 82nd Airborne Division. The 1st ABG, 503rd Inf remained with the 82nd Airborne Division until 26 March 1963, when it was relieved from assignment to the 82nd and joined 2–503rd in its assignment to the ...
The "Vessel Boiling Electric" or "BV" was an innovation at the very end of World War II, when the Centurion tank was introduced with the device fitted inside the turret. [2] [3] Previously, British tank crews had disembarked when they wanted to "brew-up" (make tea), using a petrol cooker improvised from empty fuel cans [4] called a "Benghazi burner". [5]