Search results
Results From The WOW.Com Content Network
An automated drill rig (ADR) is an automated full-sized walking land-based drill rig that drills long lateral sections in horizontal wells for the oil and gas industry. [8] ADRs are agile rigs that can move from pad to pad to new well sites faster than other full-sized drilling rigs. Each rig costs about $25 million.
Drill bit (#26) is a device attached to the end of the drill string that breaks apart the rock being drilled. It contains jets through which the drilling fluid exits. Drill floor (#21) is the area on the rig where the tools are located to make the connections of the drill pipe, bottom hole assembly, tools and bit. It is considered the main area ...
Language links are at the top of the page across from the title.
This page was last edited on 25 December 2017, at 11:28 (UTC).; Text is available under the Creative Commons Attribution-ShareAlike 4.0 License; additional terms may apply.
Simple diagram of a drilling rig and its basic operation. The kelly drive is #19. A kelly drive is a type of well drilling device on an oil or gas drilling rig that employs a section of pipe with a polygonal (three-, four-, six-, or eight-sided) or splined outer surface, which passes through the matching polygonal or splined kelly (mating) bushing and rotary table.
An oil rig is any kind of apparatus constructed for oil drilling. Kinds of oil rig include: Drilling rig, an apparatus for on-land oil drilling; Drillship, a floating apparatus for offshore oil drilling; Oil platform, an apparatus for offshore oil drilling; Oil well, a boring from which oil is extracted
Offshore drilling rig, c. 1968. The first semi-submersible resulted from an unexpected observation in 1961. [12] Blue Water Drilling Company owned and operated the four-column submersible Blue Water Rig No.1 in the Gulf of Mexico for Shell Oil Company. As the pontoons were not sufficiently buoyant to support the weight of the rig and its ...
The ban on shallow water drilling was lifted in May 2010. However, new regulations imposed on shallow water drilling have slowed the issuance of permits for new shallow water wells. [3] Shallow water operators have called this permit slowdown a "de facto moratorium" that has forced them to idle rig workers and decrease production. [4]