Ad
related to: well head specs chart
Search results
Results From The WOW.Com Content Network
In general well heads are five nominal ratings of wellheads: 2, 3, 5, 10 and 15 (×1000) psi working pressure. They have an operating temperature range of −50 to +250 degrees Fahrenheit. They are used in conjunction with ring type seal gaskets.
The scale of the technology is frequently smaller than for an oil well, and can typically fit on top of an existing hand-pumped well head. The technology is simple, typically using a parallel-bar double-cam lift driven from a low-power electric motor, although the number of pumpjacks with stroke lengths 54 inches (1.4 m) and longer being used ...
CITHP – closed-in tubing head pressure (tubing head pressure when the well is shut in) CIV – chemical injection valve; CK – choke (a restriction in a flowline or a system, usually referring to a production choke during a test or the choke in the well control system) CL – core log; CLG – core log and graph; CM – choke module
Casing Diameters of a Borehole Casing Diagram premium gas tight connections on a casing string. Casing is a large diameter pipe that is assembled and inserted into a recently drilled section of a borehole.
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
Wireline truck rigged up to a drilling rig in Canada. In the oil and gas industry, the term wireline usually refers to the use of multi-conductor, single conductor or slickline cable, or "wireline", as a conveyance for the acquisition of subsurface petrophysical and geophysical data and the delivery of well construction services such as pipe recovery, perforating, plug setting and well ...
They typically control the budget and organizational chart structure. Responsibility is the position that actually does the task. There are a variety of tasks associated with well integrity and responsibility can reside with a field's well operations engineer, operators, well service technicians, etc.
The U.S. government wanted the failed blowout preventer to be replaced in case of any pressure change that occurs when the relief well intersected with the well. [14] On September 3, 2010, at 1:20 p.m. CDT the 300 ton failed blowout preventer was removed from the well and began being slowly lifted to the surface. [ 14 ]