  2. Maximum demand indicator - Wikipedia

    en.wikipedia.org/wiki/Maximum_demand_indicator

    Maximum Demand Indicator (MDI) is an instrument for measuring the maximum amount [clarification needed] of electrical energy required by a specific consumer during a given period of time. [1] MDI instruments record the base load requirement of electrical energy .

  3. Electricity billing in the UK - Wikipedia

    en.wikipedia.org/wiki/Electricity_billing_in_the_UK

    MSP kWh is the amount of electricity consumed at the 'meter supply point', which is the customer's meter. GSP kWh is obtained by multiplying the MSP kWh by the Line Loss Factor (LLF, a figure > 1) to include the amount of electricity lost when it is conducted through the distribution network, from the 'grid supply point' to the customer's meter.

  4. Electricity meter - Wikipedia

    en.wikipedia.org/wiki/Electricity_meter

    North American domestic analog (Ferraris disk) electricity meter. Electricity meter with transparent plastic case (Israel) An electricity meter, electric meter, electrical meter, energy meter, or kilowatt-hour meter is a device that measures the amount of electric energy consumed by a residence, a business, or an electrically powered device over a time interval.

  5. Peak demand - Wikipedia

    en.wikipedia.org/wiki/Peak_demand

    Typical daily consumption of electrical power in Germany, outdated (2005) Peak demand may exceed the maximum supply levels that the electrical power industry can generate, resulting in power outages and load shedding. This often occurs during heat waves when use of air conditioners and powered fans raises the rate of energy consumption ...

  6. Electrical grid - Wikipedia

    en.wikipedia.org/wiki/Electrical_grid

    The demand, or load on an electrical grid is the total electrical power being removed by the users of the grid. The graph of the demand over time is called the demand curve. Baseload is the minimum load on the grid over any given period, peak demand is the maximum load. Historically, baseload was commonly met by equipment that was relatively ...

  7. Utilities are doubling their 5-year electricity demand ... - AOL

    www.aol.com/finance/utilities-doubling-5...

    Utilities are doubling their 5-year electricity demand projections—but high interest rates and California’s NEM 3.0 have U.S. solar in a holding pattern Chris Hopper May 20, 2024 at 6:10 AM

  8. Electricity retailing - Wikipedia

    en.wikipedia.org/wiki/Electricity_retailing

    Commercial and industrial consumers normally have more complex pricing schemes. These require meters that measure the energy usage in time intervals (such as a half-hour) to impose charges based on both the amount of energy consumed and the maximum rate of consumption, i.e. the maximum demand. This is usually called peak demand charge.

  9. Load factor (electrical) - Wikipedia

    en.wikipedia.org/wiki/Load_factor_(electrical)

    In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...