Search results
Results From The WOW.Com Content Network
The LDC curve shows the capacity utilization requirements for each increment of load. The height of each slice is a measure of capacity, and the width of each slice is a measure of the utilization rate or capacity factor. The product of the two is a measure of electrical energy (e.g. kilowatthours).
Capacity utilization or capacity utilisation is the extent to which a firm or nation employs its installed productive capacity (maximum output of a firm or nation). It is the relationship between output that is produced with the installed equipment, and the potential output which could be produced with it, if capacity was fully used. [ 1 ]
The ICU method uses the Level of Service concept, in which reports on the amount of reserved capacity or capacity deficit. In order to calculate the Level of Service for the ICU method, the ICU for an intersection must be computed first. [3] ICU can be computed by: ICU = sum(max (tMin, v/si) * CL + tLi) / CL = Intersection Capacity Utilization
Full Load hour is a measure of the degree of utilisation of a technical system. [1] [2] [3] Full load hours refer to the time for which a plant would have to be operated at nominal power in order to convert the same amount of electrical work as the plant has actually converted within a defined period of time, during which breaks in operation or partial load operation can also occur.
In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...
Utilization factor (solid line) with blade-to-gas speed ratio. The utilization factor or use factor is the ratio of the time that a piece of equipment is in use to the total time that it could be in use. It is often averaged over time in the definition such that the ratio becomes the amount of energy used divided by the maximum possible to be used.
The speed of light imposes a minimum propagation time on all electromagnetic signals. It is not possible to reduce the latency below = / where s is the distance and c m is the speed of light in the medium (roughly 200,000 km/s for most fiber or electrical media, depending on their velocity factor).
Capacity planning is the process of determining the production capacity needed by an organization to meet changing demands for its products. [1] In the context of capacity planning, design capacity is the maximum amount of work that an organization or individual is capable of completing in a given period.