When.com Web Search

  1. Ads

    related to: how to pour concrete vertically

Search results

  1. Results From The WOW.Com Content Network
  2. Slip forming - Wikipedia

    en.wikipedia.org/wiki/Slip_forming

    The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.

  3. Tremie - Wikipedia

    en.wikipedia.org/wiki/Tremie

    The tremie concrete placement method uses a vertical or nearly vertical pipe, through which concrete is placed by gravity feed below water level. [4]The lower end of the pipe is kept immersed in fresh concrete so that concrete rising from the bottom displaces the water above it, thus limiting washing out of the cement content of the fresh concrete at the exposed upper surface.

  4. Climbing formwork - Wikipedia

    en.wikipedia.org/wiki/Climbing_formwork

    Climbing formwork, also known as jumpform, is a special type formwork for vertical concrete structures that rises with the building process. While relatively complicated and costly, it can be an effective solution for buildings that are either very repetitive in form (such as towers or skyscrapers) or that require a seamless wall structure ...

  5. Concrete - Wikipedia

    en.wikipedia.org/wiki/Concrete

    Concrete is a composite material composed of aggregate bonded together with a fluid cement that cures to a solid over time. Concrete is the second-most-used substance in the world after water, [1] and is the most widely used building material. [2] Its usage worldwide, ton for ton, is twice that of steel, wood, plastics, and aluminium combined. [3]

  6. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  7. Franki piling system - Wikipedia

    en.wikipedia.org/wiki/Franki_Piling_System

    A charge of zero-slump concrete is poured into the bottom of a steel driving pipe that is placed vertically on the ground. A diesel-operated drop hammer is then driven on the concrete, forming a watertight concrete plug. [1] [4] [5] [6] The concrete plug is driven into the ground by the drop hammer.

  8. AOL Mail

    mail.aol.com

    Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!

  9. Foundation (engineering) - Wikipedia

    en.wikipedia.org/wiki/Foundation_(engineering)

    Pouring a concrete foundation. The design and the construction of a well-performing foundation must possess some basic requirements: [2] The design and the construction of the foundation is done such that it can sustain as well as transmit the dead and the imposed loads to the soil.