Detailed work plans include the construction of a "double circuit 132 kV transmission line between the Mutundwe substation in Kampala and Entebbe." [2] Work includes the extension of the existing 132/33/11 kV Mutundwe substation. In addition, a brand new outdoor 132/33 kV substation will be built in Entebbe, with 33kV indoor switchgear. [2]
Most of the world uses 50 Hz 220 or 230 V single phase, or 400 V three-phase for residential and light industrial services. In this system, the primary distribution network supplies a few substations per area, and the 230 V / 400 V power from each substation is directly distributed to end users over a region of normally less than 1 km radius.
[1] [2] A single line in the diagram typically corresponds to more than one physical conductor: in a direct current system the line includes the supply and return paths, in a three-phase system the line represents all three phases (the conductors are both supply and return due to the nature of the alternating current circuits). [1]
The voltage changes due to the transition from line-to-line to line-to-earth, typically reducing a 22 kV grid to 12.7 kV SWER or a 33 kV grid to 19.1 kV SWER. The SWER line is a single conductor that may stretch for tens or even hundreds of kilometres, with a number of distribution transformers along its length.
The file contains a single IED section, an optional communication section and an optional substation part which denotes the physical entities corresponding to the IED. System Specification Description (SSD) file: This file contains complete specification of a substation automation system including single line diagram for the substation and its ...
The study measured the electric field strength at the edge of an existing right-of-way on a 765 kV transmission line. The field strength was 1.6 kV/m, and became the interim maximum strength standard for new transmission lines in New York State. The opinion also limited the voltage of new transmission lines built in New York to 345 kV.
The first step in planning a substation layout is the preparation of a one-line diagram, which shows in simplified form the switching and protection arrangement required, as well as the incoming supply lines and outgoing feeders or transmission lines. It is a usual practice by many electrical utilities to prepare one-line diagrams with ...
TGSPDCL has a vast infrastructure facility in its operating area with 1,605 Nos. of 33/11 KV substations 3,102 Nos. of power transformers, 1,220 Nos. of 33 KV feeders 7,263 Nos. of 11 KV feeders and around 4,22,003 Nos. of distribution transformers of various capacities.