When.com Web Search

  1. Ads

    related to: concrete form plywood psf price

Search results

  1. Results From The WOW.Com Content Network
  2. Cement-bonded wood fiber - Wikipedia

    en.wikipedia.org/wiki/Cement-bonded_wood_fiber

    Cement-bonded wood fiber is used to manufacture a wide variety of products primarily for the construction industry (products like insulating concrete forms, siding materials and noise barriers). Cement bonded wood fiber materials can be classified as low density, medium density and high density.

  3. Cement board - Wikipedia

    en.wikipedia.org/wiki/Cement_board

    Cement board is composed of aggregated Portland cement with a glass-fiber mesh on the surfaces. This 5 ⁄ 16 inch (7.9 mm) thick cement board is designed as an underlayment for tile floors.

  4. Insulating concrete form - Wikipedia

    en.wikipedia.org/wiki/Insulating_concrete_form

    The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...

  5. Plywood - Wikipedia

    en.wikipedia.org/wiki/Plywood

    Sizes on specialised plywood for concrete-forming can range from 15 ⁄ 64 to 13 ⁄ 16 in (6 to 21 mm), and a multitude of formats exist, though 15 × 750 × 1,500 mm (.59in × 30 × 59 in) (19/32in × 2 ft-6in × 4 ft-11in) is very commonly used.

  6. Structural insulated panel - Wikipedia

    en.wikipedia.org/wiki/Structural_insulated_panel

    A structural insulated panel, or structural insulating panel, (SIP), is a form of sandwich panel used as a building material in the construction industry. SIP is a sandwich structured composite , consisting of an insulating layer of rigid core sandwiched between two layers of structural board.

  7. Formwork - Wikipedia

    en.wikipedia.org/wiki/Formwork

    For removable forms, once the concrete has been poured into formwork and has set (or cured), the formwork is struck or stripped to expose the finished concrete. The time between pouring and stripping depends on the job specifications, which include the cure required, and whether the form is supporting any weight; it is usually at least 24 hours ...