Ad
related to: drainage construction procedure pdf
Search results
Results From The WOW.Com Content Network
During the construction process, they set out all the necessary levels for roads, street gutters, drainage, culverts and sewers involved in construction operations. Civil engineers and construction managers work alongside architects and supervisors, planners, quantity surveyors , and the general workforce, as well as subcontractors.
With the design complete, construction is the next step. Most soil nail wall construction follows a specific procedure. First, a cut is excavated and temporary bracing is put in place if necessary. This is done with conventional earth moving equipment and hydraulic drills.
The purpose of a land drain is to allow water in wet or swampy ground to rapidly drain away [1] or to relieve hydrostatic pressure. They are subterranean linear structures which are laid to a fall which should be as steep as practicable. They are used in agriculture and in building construction sites.
Drainage design procedures. When the land needs a subsurface drainage system, but saline groundwater is present at great depth, it is better to employ a shallow, closely spaced system of pipes or ditches instead of a deep, widely spaced system. The reason is that the deeper systems produce a more salty effluent than the shallow systems.
Sites plan typically show buildings, roads, sidewalks and paths/trails, parking, drainage facilities, sanitary sewer lines, water lines, lighting, and landscaping and garden elements. [ 1 ] Such a plan of a site is a "graphic representation of the arrangement of buildings, parking, drives, landscaping and any other structure that is part of a ...
The drain is characterized by its long length and narrow width, the cross-section of the drain is a function of the maximum flow volume anticipated from the surrounding surface. Channels can range from 1 inch (2.5 cm) to 2 feet (61 cm) in width, while depths can reach up to 4 feet (120 cm).
Drainage law is a specific area of water law related to drainage of surface water on real property. It is particularly important in areas where freshwater is scarce, flooding is common, or water is in high demand for agricultural or commercial purposes.
Invert level affects flow from drainage pipes In civil engineering , the invert level is the base interior level of a pipe, trench or tunnel ; it can be considered the "floor" level. [ 1 ] The invert is an important datum for determining the functioning or flowline of a piping system.