Search results
Results From The WOW.Com Content Network
A reactor vessel head for a pressurized water reactor. This structure is attached to the top of the reactor vessel body. It contains penetrations to allow the control rod driving mechanism to attach to the control rods in the fuel assembly. The coolant level measurement probe also enters the vessel through the reactor vessel head.
The pressurizer vessel itself may be maintained much hotter than the rest of the reactor plant to ensure pressure control, because in the liquid throughout the reactor plant, pressure applied at any point has an effect on the entire system, whereas the heat transfer is limited by ambient and other losses.
Download as PDF; Printable version; In other projects ... National Board of Boiler and Pressure Vessel Inspectors; Nuclear reactor physics; Nuclear reactor; O. Oxygen ...
The reactor pressure vessel is manufactured from ductile steel but, as the plant is operated, neutron flux from the reactor causes this steel to become less ductile. Eventually the ductility of the steel will reach limits determined by the applicable boiler and pressure vessel standards, and the pressure vessel must be repaired or replaced ...
The High Pressure Coolant Injection (HPCI) System consists of a pump or pumps that have sufficient pressure to inject coolant into the reactor vessel while it is pressurized. It is designed to monitor the level of coolant in the reactor vessel and automatically inject coolant when the level drops below a threshold.
The time required for the molten metal of the core to breach the primary pressure boundary (in light water reactors this is the pressure vessel; in CANDU and RBMK reactors this is the array of pressurized fuel channels; in PHWR reactors like Atucha I, it will be a double barrier of channels and the pressure vessel) will depend on temperatures ...
Its 180 MWe pressurized water reactor operated from 1961 to 1991. [1] It produced electricity for New England consumers. The site is referred to as "Yankee-Rowe" or simply "Rowe", to avoid confusion with Vermont Yankee, another nuclear power station located in nearby Vernon, Vermont. The decommissioning of the site was completed in 2007.
Control rods are usually used in control rod assemblies (typically 20 rods for a commercial PWR assembly) and inserted into guide tubes within the fuel elements. Control rods often stand vertically within the core. In PWRs they are inserted from above, with the control rod drive mechanisms mounted on the reactor pressure vessel head. In BWRs ...