Ads
related to: how does slip casting work in water lines in concrete driveway construction
Search results
Results From The WOW.Com Content Network
The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.
Concrete used for canal lining is typically non-reinforced, as a way to reduce cost. A common method for constructing concrete lining is the use of slip forms, which are drawn down the length of the canal as the concrete is poured. [3] Hand laying of concrete or prefabricated sections are also used when only a short distance needs to be covered ...
The properties of a casting slip depends on multiple factors, including: [10] the properties of each raw material in the slip, the solids content of the slip, the clay:non-plastic ratio in the slip, the chemicals in the slip, either deliberately added or introduced from the raw materials and water, the type and amount of deflocculant,
Cast-in-place concrete or Cast-in-situ concrete is a technology of construction of buildings where walls and slabs of the buildings are cast at the site in formwork. [1] This differs from precast concrete technology where slabs are cast elsewhere and then brought to the construction site and assembled. [ 2 ]
Schematic cross section of a pressurized caisson. In geotechnical engineering, a caisson (/ ˈ k eɪ s ən,-s ɒ n /; borrowed from French caisson 'box', from Italian cassone 'large box', an augmentative of cassa) is a watertight retaining structure [1] used, for example, to work on the foundations of a bridge pier, for the construction of a concrete dam, [2] or for the repair of ships.
The tremie concrete placement method uses a vertical or nearly vertical pipe, through which concrete is placed by gravity feed below water level. [4]The lower end of the pipe is kept immersed in fresh concrete so that concrete rising from the bottom displaces the water above it, thus limiting washing out of the cement content of the fresh concrete at the exposed upper surface.
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
Shallow foundation construction example. Often called footings, are usually embedded about a meter or so into soil. One common type is the spread footing which consists of strips or pads of concrete (or other materials) which extend below the frost line and transfer the weight from walls and columns to the soil or bedrock.
Ad
related to: how does slip casting work in water lines in concrete driveway construction