Search results
Results From The WOW.Com Content Network
Takt time, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand.Often confused with cycle time, takt time is a tool used to design work and it measures the average time interval between the start of production of one unit and the start of production of the next unit when items are produced sequentially.
[1] When formation of a cell would be too difficult, a simple principle is applied in order to improve efficiencies and flow, that is, to perform processes in a specific location and gather materials to that point at a rate dictated by an average of customer demand (this rate is called the takt time). This is referred to as the Pacemaker Process.
For such problems, to achieve given accuracy, it takes much less computational time to use an implicit method with larger time steps, even taking into account that one needs to solve an equation of the form (1) at each time step. That said, whether one should use an explicit or implicit method depends upon the problem to be solved.
The method removes secular terms—terms growing without bound—arising in the straightforward application of perturbation theory to weakly nonlinear problems with finite oscillatory solutions. [1] [2] The method is named after Henri Poincaré, [3] and Anders Lindstedt. [4]
In this method, the basic shape function is modified to obtain the upwinding effect. This method is an extension of Runge–Kutta discontinuous for a convection-diffusion equation. For time-dependent equations, a different kind of approach is followed. The finite difference scheme has an equivalent in the finite element method (Galerkin method ...
The averaging method yields an autonomous dynamical system ˙ = (,,) =: ¯ which approximates the solution curves of ˙ inside a connected and compact region of the phase space and over time of /. Under the validity of this averaging technique, the asymptotic behavior of the original system is captured by the dynamical equation for y ...
In industrial engineering, the standard time is the time required by an average skilled operator, working at a normal pace, to perform a specified task using a prescribed method. [1] It includes appropriate allowances to allow the person to recover from fatigue and, where necessary, an additional allowance to cover contingent elements which may ...
In computational fluid dynamics, the MacCormack method (/məˈkɔːrmæk ˈmɛθəd/) is a widely used discretization scheme for the numerical solution of hyperbolic partial differential equations. This second-order finite difference method was introduced by Robert W. MacCormack in 1969. [ 1 ]