When.com Web Search

  1. Ads

    related to: 12000 running watt generator manual

Search results

  1. Results From The WOW.Com Content Network
  2. Pico hydro - Wikipedia

    en.wikipedia.org/wiki/Pico_hydro

    A pico hydro system made by the Sustainable Vision project from Baylor University [1]. Pico hydro is a term used for hydroelectric power generation of under 5 kW. These generators have proven to be useful in small, remote communities that require only a small amount of electricity – for example, to power one or two fluorescent light bulbs and a TV or radio in 50 or so homes. [2]

  3. MOBIDIC - Wikipedia

    en.wikipedia.org/wiki/MOBIDIC

    MOBIDIC replaced many manual steps; it performed the collation lookup, sorting the data, and collecting all the printed messages for delivery. MOBIDIC was a 36-bit binary machine, a common word size for early computers.

  4. Diesel generator - Wikipedia

    en.wikipedia.org/wiki/Diesel_generator

    A specific model of a generator operated as a standby generator may only need to operate for a few hours per year, but the same model operated as a prime power generator must operate continuously. When running, the standby generator may be operated with a specified - e.g. 10% overload that can be tolerated for the expected short running time.

  5. Power-to-weight ratio - Wikipedia

    en.wikipedia.org/wiki/Power-to-weight_ratio

    Toshiba 660 MVA water cooled 23 kV AC turbo generator: 1,342 t 2,959,000 lb 660 MW 890,000 hp 0.49 kW/kg 0.30 hp/lb Bayswater, Eraring coal-fired power stations: Canopy Tech. Cypress 32 MW 15 kV AC PM generator [29] 33,557 kg 73,981 lb 32 MW 43,000 hp 0.95 kW/kg 0.58 hp/lb Electric power stations: Turncircles AF24PM–S axial flux motor [30]

  6. Hydropower - Wikipedia

    en.wikipedia.org/wiki/Hydropower

    The water spins a turbine, which is connected to the generator that produces electricity. [13] The other type is called a run-of-river plant. In this case, a barrage is built to control the flow of water, absent a reservoir. The run-of river power plant needs continuous water flow and therefore has less ability to provide power on demand.

  7. AOL Mail

    mail.aol.com

    Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!

  8. Europrop TP400 - Wikipedia

    en.wikipedia.org/wiki/Europrop_TP400

    In the gas generator, the low pressure compressor, called an intermediate pressure compressor (IPC) by Europrop International because it is driven by an IP turbine, is designed by MTU Aero Engines and has five stages. [13] The high-pressure compressor (HPC) is designed by Rolls-Royce and has six stages, the first two of which are variable. [35]

  9. Army Nuclear Power Program - Wikipedia

    en.wikipedia.org/wiki/Army_Nuclear_Power_Program

    Combustion Engineering was awarded a contract by the AEC to operate the SL-1 and in turn employed the Army's military operating crew to continue running the plant. This BWR was specifically designed to power DEW line stations. On January 3, 1961, the reactor was being prepared for restart after a shutdown of eleven days over the holidays.