Ad
related to: third line oil well control valve repair diagrams pdf template
Search results
Results From The WOW.Com Content Network
The valve at the top is called the swab valve and lies in the path used for well interventions like wireline and coiled tubing. For such operations, a lubricator is rigged up onto the top of the tree and the wire or coil is lowered through the lubricator, past the swab valve and into the well. This valve is typically manually operated.
Another reason relates to the hydraulic control line. Hydraulic pressure is required to keep the valve open as part of the failsafe design. However, if the valve is too far down the well, then the weight of the hydraulic fluid alone may apply sufficient pressure to keep the valve open, even with the loss of surface pressurisation.
Secondary oil well control is done after the Primary oil well control has failed to prevent formation fluids from entering the wellbore. This process uses "blow out preventer", a BOP, to prevent the escape of wellbore fluids from the well. As the rams and choke of the BOP remain closed, a pressure built up test is carried out and a kill mud ...
the drilling and operating companies well control policies. For workover or completion operations, other methods are often used. Bullheading is a common way to kill a well during workovers and completions operations but is not often used while drilling. Reverse circulation is another kill method used for workovers that are not used for drilling ...
When the well has been drilled, it is completed to provide an interface with the reservoir rock and a tubular conduit for the well fluids. The surface pressure control is provided by a Christmas tree, which is installed on top of the wellhead, with isolation valves and choke equipment to control the flow of well fluids during production.
It is a cylindrical valve with either a ball or flapper closing mechanism. It is installed in the production tubing and is held in the open position by a high-pressure hydraulic line from surface contained in a 6.35 mm (1/4") control line that is attached to the DHSV's hydraulic chamber and terminated at surface to a hydraulic actuator. The ...
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
Suction line (#3) is an intake line for the mud pump to draw drilling fluid from the mud tanks. Swivel (#18) is the top end of the kelly that allows the rotation of the drill string without twisting the block. Traveling block (#11) is the moving end of the block and tackle. Together, they give a significant mechanical advantage for lifting.