  1. Results From The WOW.Com Content Network
  2. Pal-Kal - Wikipedia

    en.wikipedia.org/wiki/Pal-Kal

    Pal-Kal (Hebrew: פל קל) was a construction method for concrete ceilings, invented by engineer Eli Ron in the late 1970s (Israel Patent No. 104,101 [1]).. The Pal-Kal method offered an easier, faster, and cheaper solution for casting ceilings compared to traditional reinforced concrete slabs.

  3. Cast-in-place concrete - Wikipedia

    en.wikipedia.org/wiki/Cast-in-place_concrete

    Cast-in-place concrete or Cast-in-situ concrete is a technology of construction of buildings where walls and slabs of the buildings are cast at the site in formwork. [1] This differs from precast concrete technology where slabs are cast elsewhere and then brought to the construction site and assembled. [ 2 ]

  4. Slip forming - Wikipedia

    en.wikipedia.org/wiki/Slip_forming

    The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.

  5. Concrete - Wikipedia

    en.wikipedia.org/wiki/Concrete

    Concrete is a composite material composed of aggregate bonded together with a fluid cement that cures to a solid over time. Concrete is the second-most-used substance in the world after water, [1] and is the most widely used building material. [2] Its usage worldwide, ton for ton, is twice that of steel, wood, plastics, and aluminium combined. [3]

  6. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  7. Formwork - Wikipedia

    en.wikipedia.org/wiki/Formwork

    For removable forms, once the concrete has been poured into formwork and has set (or cured), the formwork is struck or stripped to expose the finished concrete. The time between pouring and stripping depends on the job specifications, which include the cure required, and whether the form is supporting any weight; it is usually at least 24 hours ...

  8. AOL Mail

    mail.aol.com

    Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!

  9. Concrete slab - Wikipedia

    en.wikipedia.org/wiki/Concrete_slab

    The second consideration is the high thermal mass of concrete slabs, which applies similarly to walls and floors, or wherever concrete is used within the thermal envelope. Concrete has a relatively high thermal mass, meaning that it takes a long time to respond to changes in ambient temperature. [9]