Search results
Results From The WOW.Com Content Network
Shoring is a term used in the process of air freight container and pallet (ULD) buildup, e.g. making sure that the cargo placed in containers and on pallets is packed securely and efficiently. Specifically, shoring is done to affix cargo to the ULD and adapt different form factors of cargo items to maximize the use of the available ULD volume.
Heavy construction equipment is usually used due to the amounts of material to be moved — up to millions of cubic metres. Earthwork construction was revolutionized by the development of the scraper and other earth-moving machines such as the loader, the dump truck, the grader, the bulldozer, the backhoe, and the dragline excavator.
Performance testing is a more reliable method of predicting the load-elongation behavior, and is conducted on a selected number of tiebacks in a project. For performance testing, a particular sequence of increasing and decreasing loads are applied, using equipment similar to those used in the proof test.
A soil sample recovered from a test boring using a split spoon sampler. Borings come in two main varieties: large diameter and small diameter. Large-diameter borings are rarely used because of safety concerns and expense but are sometimes used to allow a geologist or an engineer to visually and manually examine the soil and rock stratigraphy in-situ.
Category for the construction methods involved in the shoring (to avoid collapse of retaining walls) of excavation Subcategories This category has the following 4 subcategories, out of 4 total.
Tunnel Construction. Tunnels are dug in types of materials varying from soft clay to hard rock. The method of tunnel construction depends on such factors as the ground conditions, the ground water conditions, the length and diameter of the tunnel drive, the depth of the tunnel, the logistics of supporting the tunnel excavation, the final use and shape of the tunnel and appropriate risk management.
First proposed by Karl Terzaghi and later discussed in a paper by Ralph B. Peck, the observational method is a managed process of construction control, monitoring, and review, which enables modifications to be incorporated during and after construction. The method aims to achieve a greater overall economy without compromising safety by creating ...
Continuous flight augering can be used to construct a secant piled wall which can be used as a retaining wall or as shoring during excavation. Once initial piles are set with concrete, other shafts are augured between them, slicing into the original piles, with the new ones receiving rebar.