When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Wind turbine design - Wikipedia

    en.wikipedia.org/wiki/Wind_turbine_design

    An example of a wind turbine, this 3 bladed turbine is the classic design of modern wind turbines Wind turbine components : 1-Foundation, 2-Connection to the electric grid, 3-Tower, 4-Access ladder, 5-Wind orientation control (Yaw control), 6-Nacelle, 7-Generator, 8-Anemometer, 9-Electric or Mechanical Brake, 10-Gearbox, 11-Rotor blade, 12-Blade pitch control, 13-Rotor hub

  3. Piping and instrumentation diagram - Wikipedia

    en.wikipedia.org/wiki/Piping_and_instrumentation...

    P&IDs are originally drawn up at the design stage from a combination of process flow sheet data, the mechanical process equipment design, and the instrumentation engineering design. During the design stage, the diagram also provides the basis for the development of system control schemes, allowing for further safety and operational ...

  4. Engineering design process - Wikipedia

    en.wikipedia.org/wiki/Engineering_design_process

    The engineering design process, also known as the engineering method, is a common series of steps that engineers use in creating functional products and processes. The process is highly iterative – parts of the process often need to be repeated many times before another can be entered – though the part(s) that get iterated and the number of such cycles in any given project may vary.

  5. Control loop - Wikipedia

    en.wikipedia.org/wiki/Control_loop

    A control loop is the fundamental building block of control systems in general and industrial control systems in particular. It consists of the process sensor, the controller function, and the final control element (FCE) which controls the process necessary to automatically adjust the value of a measured process variable (PV) to equal the value of a desired set-point (SP).

  6. Motor–generator - Wikipedia

    en.wikipedia.org/wiki/Motor–generator

    As an example, a 250 kVA motor–generator operating at 300 ampere of full load current will require 1550 ampere of in-rush current during a re-closure after 5 seconds. This example used a fixed mounted flywheel sized to result in a 1 ⁄ 2 Hz per second slew rate. The motor–generator was a vertical type two-bearing machine with oil-bath ...

  7. ‘Connections’ Hints and Answers for NYT's Tricky Word Game on ...

    www.aol.com/connections-hints-answers-nyts...

    If you've been having trouble with any of the connections or words in Thursday's puzzle, you're not alone and these hints should definitely help you out. Plus, I'll reveal the answers further down ...

  8. Combined cycle power plant - Wikipedia

    en.wikipedia.org/wiki/Combined_cycle_power_plant

    A typical single-shaft system has one gas turbine, one steam turbine, one generator and one heat recovery steam generator (HRSG). The gas turbine and steam turbine are both coupled in tandem to a single electrical generator on a single shaft. This arrangement is simpler to operate, smaller, with a lower startup cost.

  9. AOL Mail

    mail.aol.com

    Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!