In the UK, a concrete tiled roof would normally have rafters at 600 mm (24 in) centers, roof battens at 300 mm (12 in) centers and ceiling joists at 400 mm (16 in) centers. The United States still uses imperial units of measurement and framing members are typically spaced sixteen or twenty-four inches apart.
The term binding joist is sometimes used to describe beams at floor level running perpendicular to the ridge of a gable roof and joined to the intermediate posts. Joists which land on a binding joist are called bridging joists. [4] [5] A large beam in the ceiling of a room carrying joists is a summer beam. A ceiling joist may be installed flush ...
In light-frame construction, a trimmer is a timber or metal beam (joist) used to create an opening around a stairwell, skylight, chimney, and the like. Trimmers are installed parallel to the primary floor or ceiling joists and support headers, which run perpendicular to the primary joists.
[1] [2] It consisted of single-insulated copper conductors run within wall or ceiling cavities, passing through joist and stud drill-holes via protective porcelain insulating tubes, and supported along their length on nailed-down porcelain knob insulators.
A similar situation occurs where the I-joist crosses a main beam. Installing squash blocks (2×4 materials 1 ⁄ 16 in or 1.6 mm higher than the I-joist) alongside the I-joists transfers the load from the I-joist onto the beam. Missed nails and glue setting too fast can lead to an uneven or squeaky floor.
Timber roof truss example. The top members of a truss are known generically as the top chord, bottom members as the bottom chord, and the interior members as webs.In historic carpentry the top chords are often called rafters, and the bottom chord is often referred to as a tie beam.
The CJ-Series Joists are capable of supporting larger floor or roof loadings due to the attachment of the concrete slab to the top chord of the composite joist. Shear connection between the concrete slab and steel joist is typically made by the welding of shear studs through the steel deck to the underlying CJ-Series Composite Steel Joist. [2]
Vertical, metal furring is applied to the wall to create a channel and receive the siding material. In construction, furring (furring strips) are strips of wood or other material applied to a structure to level or raise the surface, to prevent dampness, to make space for insulation, to level and resurface ceilings or walls, [1] or to increase the beam of a wooden ship.