Search results
Results From The WOW.Com Content Network
Greater Bangkok commuter rail is a commuter rail system in Bangkok Metropolitan Region, Phra Nakhon Si Ayutthaya Province, Saraburi Province, Lopburi Province, Suphan Buri Province, Ratchaburi Province, Chacheongsao Province, Nakhon Nayok Province, Prachinburi Province, and Samut Songkhram Province. It runs from and to the outskirts of the city ...
The BTS Skytrain Map of Bangkok urban transit systems. Bangkok Metropolitan Region is served by 9 rapid transit rail lines as of 2023. The BTS Skytrain consists of three lines, the Sukhumvit Line, Silom Line and Gold Line.
Eastern Bangkok Monorail (Yellow Line) under concession from MRTA Northern Bangkok Monorail (Pink Line) under concession from MRTA. Airport Rail Link: 2010 1 28.6 km (17.8 mi) 8 Asia Era One under concession from SRT [3] SRT Red Lines: 2021 2 41 kilometres (25 mi) 14 SRT: Total 10 275.55 km (171.22 mi) 162
The Red Line Mass Transit System Project is a commuter rail system serving the Bangkok Metropolitan Region in Thailand. Construction began in January 2009, and free public trial operation began on 2 August 2021, when Bang Sue Grand Station opened, with full commercial service starting in November 2021. [2]
The following lists the stations of all urban rail transit systems in Bangkok and the surrounding Bangkok Metropolitan Region, including the BTS, MRT, Airport Rail Link and SRT Red Lines. It does not include the 12 stations of the Bangkok BRT. The table below lists 192 stations in operation, comprising: 47 stations on the BTS Sukhumvit Line
By the end of 2013, the project was only 3% done & already months behind schedule due to delays in removing the Hopewell Pillars. [14] In June 2014, the SRT requested an additional 8.14 billion baht to modify the Dark Red line to 4 tracks instead of 3, to accordingly redesign all stations and to provide for the longer platforms for the Bang Sue ...
The 28.6-kilometer (17.8 mi)-long Airport Rail Link opened for service on 23 August 2010. [2] In the future, Airport Rail Link will extend from Phaya Thai towards Krung Thep Aphiwat Central Terminal and Don Mueang International Airport. Its rail will also be used for the proposed Don Mueang–Suvarnabhumi–U-Tapao high-speed railway.
The Gold Line is an automated people mover line, part of Bangkok's rapid transit system. The line is 1.8 km (1.1 mi) long, consisting of 3 stations, [2] and was opened by Thai Prime Minister Prayut Chan-o-cha on 16 December 2020. [3]